HL-LHC Integration Meeting: LS3 equipment dismantling readiness & preparation - WP5

→ Europe/Zurich
376/1-020 (CERN)

376/1-020

CERN

16
Show room on map
    • 10:30 → 10:35
      Introduction, Objectives and Deliverables 5m

      Introduction to the meeting, stating:
      - motivation behind this meeting;
      - objectives and responsibilities;
      - WP15 deliverables.

      Speaker: Michele Modena (CERN)
    • 10:35 → 10:50
      WP5: Summary of Expected LS3 Dismantling Activities 15m

      Short SUMMARY of the dismantling activities of the WP5 taking place during LS3 in P1 and P5 of LHC.

      Speakers: Inigo Lamas Garcia (CERN), Stefano Redaelli (CERN)
    • 10:50 → 11:05
      Radiation Protection (HSE-RP) Constraints 15m

      Boundary conditions and constraints for the LS3 dismantling activities in P1 and P5 for the WP will be presented.

      Speaker: Cristina Adorisio (CERN)
    • 11:05 → 11:20
      Transport (EN-HE) Procedures 15m

      Transport (procedure and tooling) boundary conditions and readiness will be presented.

      Speaker: Caterina Bertone (CERN)
    • 11:20 → 11:50
      WP5 Status and Readiness of Procedure 30m

      The following aspects will be addressed and discussed:
      - Availability and status of dismounting procedures and tooling
      - Identification of all needed intervenants and interfaces
      - Evaluation of the needed resources/teams also considering the plan estimation for the dismantling phase.

      Speakers: Inigo Lamas Garcia (CERN), Stefano Redaelli (CERN)
    • 11:50 → 12:00
      Discussion, summary and actions list 10m

      Following the discussion, we will try to sum up the status of knowledge and readiness of the LS3 dismantling activities for the WP and list the eventual major open issues needing follow-up and future actions,

      Speaker: Michele Modena (CERN)