Review of the CLIC Post-Collision Line

Europe/Zurich
6/2-004 (CERN)

6/2-004

CERN

40
Show room on map

Participants: Vera, Rogelio, Andri, Ranjun, Yongke, Xingguang, Chet, Neven, Pierre, Andrea, Ryan

News:
* ATF2, IPBSM not working.

Ryan presents. CDR design didn't consider diagnostics or luminosity monitoring. BDSIM simulation. Ryan adapted the design to the magnets in the magnet catalog.

Actions:
Check the collimators role. So far he put them as large as the beam pipe.
Track positrons, beamstrahlung, incoherent pairs, muons, ... from the interaction.
Leave files behind. Add them to the lattice repository. BDSIM model?

Potential improvements: make system smaller (at 380 GeV), reducing beam pipe, to enable the inclusion of diagnostics (polarimeter, beam size monitor, etc. ).
 