GIF++ installation and schedule meeting
-
-
09:15
→
09:25
Review of last week operation & plans for this week 10m
Yesterday summary :
Downstream :
ATLAS RPC - has moved forward to 2 meters, chamber currently under repair, will come back ≈ next week.
CMS-CSC : One chamber next to RPC (unchanged)
CMS-CSC + LHCb : moved back to 5 mToday :
Short Access at 14h30 (30 minutes) for safety visit.
Source scans :
Upstream :
=========
This afternoon : ATLAS-MM : 1000 / 100 / 50 / 22 / 10 / 6.9 / 4.6 / 2.2 / 1 - each ≈ 1h. Quick source stop in between. EP-DT joins this.
Friday : Filterscan 9h to 3 PM. Same range.
Weekend stable 6.9
Monday : Ramp ≈ 4h form 9-14h.Downstream :
==========
Starting now : CMS- DT : 8 filters scan between 460-15, 1.2h each.
-
09:25
→
09:40
Mass Production Test Schedule 15m
Upstream field :
ATLAS-MM : LM2 at 1 meter for one more week
SM2 at 1.1 m - for 2 more weeks
SM1 at 1.5 m - for 2 more weeks
(we expect new chambers mid December)
starting from January 4 chambers per months - 2 / 4 chambers at the same time. ≈ for 1 year.ALICE TCP : 6 chambers, (3 big, 3 small) - 2 at the same time, swap takes 45 minutes.
currently on hold, restarting in two weeks (then mostly unshadowed)
Total 20-30 (aiming for 6 per week, 1 day flushing, few hours for testing) - 5 weeksDownstream :
CMS-DT 1/15 campaign until early January.
ATLAS - sTGC : 5-6 chambers should arrive beginning of December - half an hour for each chamber(might be better compatible with upstream) - 09:40 → 09:50
-
09:50
→
10:00
Infrastructure & Upgrades to the Facility 10m
Improvements needed or planned for the facility.
Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)Ongoing Projects :
NEW retrieval of TIMBER values : Work in progress, but already available in beta version
https://epdtdi-pytimber.web.cern.ch/app/gifpp (also linked from main GIF page.Additional values need to be collected/republished ?
- REMUS - to be included in GIF Display
- XTDV - to be included in pytimber onlyDIP Bridge between TN and GPN : Finally on real machine (not VM) asnd located in the CCC rack room. In case of failure, we call the CCC/TI operator on 72201, and ask him to contact the "ICS CONTROL PIQUET" for this.
-
10:00
→
10:30
Announcements 30m
You can subscribe to the calendar with the following link (to be added in you calendar application)
http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics-
IMPACTS for 2018 5m
Guidelines for filling in IMPACT requests
General Guideline : One IMPACT per setup.
- two chambers on individual supports -> 2 IMPACT declarations
- multiple chambers swapped on same or similar support -> one IMPACT declaration
- basically, if you need two locations, please make two IMPACT declaration (clone)
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).NEW IMPACT needed for 2018. (All current IMPACTS will expire at Saturday 23.December)
Special IMPACT needed for Christmas Closure.
-
-
09:15
→
09:25