Mechanical instrumentation meeting

Europe/Zurich

Action items:

- CERN:

  • send MX1615 connectors and cable references to CEA
  • 2x20 to 40 pin adaptor to fabricate for SG acquisition during collaring at CERN

- CEA:

  • update the wiring diagram with the proper pin connection for MX 1615
  • get in contact with Nicolas to check what is the best time for CEA to assist during the press set-up

Update on the tooling for coil rigidity measurement

- measuring bars should be ready to go to 927 on week 48 (nov 26-30)

-set-up of the press should start on week 49/50

- the bottom part of the tool has been sent by DMP to CERN on Nov 19th 

Preparation of the SG measurement

- the modules MX 1615 will be used

-CERN will provie the cables fot the connextion to the DAQ during collaring. A 2x20 to 40 pin connector adaptor has to be made on CERN side

- the pin set up of the MW1615 connectros are different from the MX 840.

  • 2 supply +
  • 5 sense lead-
  • 6 measurement
  • 4 supply -
  • 3 sense lead +

- twisted pairs should be used: 2/5 should be twisted as well as 3/4. 6 can be twisted with a 6 from another bridge

 

There are minutes attached to this event. Show them.
    • 09:00 09:30
      CEA update 30m
      Speakers: Damien Simon (Université Paris-Saclay (FR)), Helene Felice (Université Paris-Saclay (FR)), Simon Perraud
    • 09:30 10:00
      CERN update 30m
      Speakers: Michael Guinchard (CERN), Sohrab Emami Naini