(FE, VV)
SG:
No news on Albania training.
Simplified schema accepted by SG-WG. Script written to populate SG site database from excel file. Web application developed to r/w to SG site database. This should be in production by end of Jan 06.
GD:
Old JRA1 build system https://uimon.cern.ch/twiki//bin/view/LCG/LcgSoftwarePorting
LCG2.7.0 testing
Debian testing finished. All patches given to Oliver. Considered done.
CIC-on-duty schedule:
Project Week Calendar Week Week start date Lead Site Backup Site Notes
94 03 2006 2006-01-16 RAL ASGC RAL will take the whole shift
95 04 2006 2006-01-23 INFN IN2P3
96 05 2006 2006-01-30 CERN SINP-MSU
97 06 2006 2006-02-06 ASGC RAL
There are minutes attached to this event.
Show them.