    • 1
      Review of last week operation & plans for this week

      Yesterday summary :

      Upstream :

      =========
      ATLAS-MM : left until January, in preparation area for the moment (RP checked)
      CMS-CSC: small chamber hosted on LHCb setup at 3.5m
      ALICE TPC at 2 m unshadowed
      EP-DT2 : 5m next to CMS-RPC
      CMS-RPC : Trolley 1 at 5m, Trolley 3 at 4m

      Downstream :
      ==========
      CMS-GEM 1+2 : 1m
      EP-DT1 : 1.5 m
      ATLAS-RPC : 2.5 m  (back in bunker)  + second trolley to be moved in soon
      CMS-CSC 1 : 2.5 m
      CMS-CSC 3 + LHCb : 5 m
      CMS-DT : 

      Filter scan :
      =========

      Thu 06th - access at 2pm for 1.5h

      Upstream :

      EP-DT2: filter 100 for 3h starting at 3.30pm 
      CMS-RPC : want 2.2 for whole week
      ALICE : full field for 1h  around 10.30am

      Downstream :

      CMS-DT: 5h in range 460-22

      ============================================

      Friday 07th: access of 1.5h in the afternoon

      Upstream: 

      EP-DT2: 3 hours of source on with attenuation 1000 or more in the morning starting around 9am

      Downstream:

      CMS-DT will profit for having an attenuation 1000 upstream

      =========================================================================

      Monday 10th: access of 1h morning/afternoon depending on the results of the previous test (ALICE-TPC) 

       

       

       

       




       

    • 2
      Mass Production Test Schedule

      Upstream field :

      ATLAS-MM :   LM2  out   - comes back next year Jan/Feb.
                                SM1 &  SM2  out until Jan.
                                starting from January 4 chambers per months  - 2 / 4 chambers at the same time  ≈ for 1 year.

      ALICE TPC : 6 chambers, (3 big, 3 small)  - 2 at the same time, swap takes 45 minutes.
                      moving to test 2 big chambers in parallel
                     test restarted (unshadowed)
                     Total 20-30 (aiming for 6 per week,  1 day flushing, few hours for testing)  - 5 weeks

      Downstream :

      CMS-DT  1/15 campaign until early January.

      ATLAS - sTGC :  5-6 chambers should arrive beginning of mid January - half an hour for each chamber
                (might be better compatible with upstream)
                In addition : 1 chamber currently flushed in the preparation area, to be moved into the upstream area next week.
                (to be confirmed on Monday)
                              
       
      ATLAS-RPC : two gas gap chamber to arrive next week
    • 3
      New requests for tests at GIF

      introduction, goal of the test, plan, needs

      ALICE - FE Electronic upgrade. To be defined.

    • 4
      Infrastructure & Upgrades to the Facility

      Improvements needed or planned for the facility.

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      New Items :
      ==========

      CERN wide power cut on 19.12 - 6h.

       

       

       

       

      Ongoing Projects :

      NEW retrieval of TIMBER values : Work in progress, but already available in beta version
      https://epdtdi-pytimber.web.cern.ch/app/gifpp (also linked from main GIF page.

      Additional values need to be collected/republished ?
              - REMUS  - to be included in GIF Display
              - XTDV - to be included in pytimber only

      • a) Requirements during LS2 + Christmas

        CMS-DT : Ar/CO2        70 l/h
        CMS-CSC : AR/CO2     10 l/h
        EP-DT : will let us know

        We potentially need a piquet from the user side. Access to be requested via TC.

         

        Proposal : Stop of gas (except flushing) on Thursday 20.12 afternoon. -> User operation stopped before lunch time.
                         Restart of gas supply : Monday 7.01 -> User operation starting Tuesday

    • 5
      Announcements

      You can subscribe to the calendar with the following link (to be added in you calendar application)
      http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics

      • a) IMPACTS for 2019

        Guidelines for filling in IMPACT requests

        General Guideline : One IMPACT per setup.

        • two chambers on individual supports -> 2 IMPACT declarations
        • multiple chambers swapped on same or similar support -> one IMPACT declaration
        • basically, if you need two locations, please make two IMPACT declaration (clone)

        Each Setup should have IMPACT label attached with number.
        Attached documents : CAD file  or  picture.
        Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).

        NEW IMPACT needed for 2018. (All current IMPACTS will expire at Saturday 23.December)

        Special IMPACT needed for Christmas Closure.

      • b) New Announcements
      • c) AOB

        AIDA Transnational Access - Still fund available. Please provide  feedback by tonight to M. Moll.

        Next weeks meeting : different room !   (864-1-B04)