GIF++ installation and schedule meeting

Europe/Zurich
892/1-B09 (CERN)

892/1-B09

CERN

30
Show room on map
Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN), Federico Ravotti (CERN)
There are minutes attached to this event. Show them.
    • 09:15 09:25
      Review of last week operation & plans for this week 10m

      Restart of facility :
      ===============

      Gas systems available : Monday afternoon
      Irradiator testing : Tuesday morning (see comments in Infrastructure section)
      Facility operational : Tuesday 11h
       

      Wednesday Installation :

      ALICE arrived with 8 chambers, 2 in irradiation, 6 in corridor.
      sTGC with one test chamber - 1 month test, running
      CMS-RPC trolly 1&3
      EP-DT2

      LHCb + CMS-CSC small prototype - IMPACT missing
      CMS-GEM 1&2
      EP-DT1
      CMS-CSC
      ATLAS-RPC - 2 setups, IMPACT missing
      CMS-DT MB1&2
      CMS-CSC + LHCb  (IMPACT for LHCb missing)

      Pb blocks stored on the outside.

       

      ALICE : 9h measurement  - factor 1 for 1h
      10h access for 1h to swap chambers. 
      Same for Saturday, Monday,
      Tuesday 1h 9h-10h factor 1
      otherwise 2.2 in upstream field

       

      Filter Scans :
      ==========

      Upstream : 6.9  for 2-3h, starting after the meeting
                         100 for 4-6h  in the afternoon

      Downstream : nothing announced.

      Access requests :
      ============

      1h requested by EP-DT Friday ->10:00 in combination with ALICE




       

    • 09:25 09:40
      Mass Production Test Schedule 15m

      Upstream field :

      ATLAS-MM :   LM2  out   - comes back next year Jan/Feb.
                                Starting from 23 January  (latest 30.1),  2 chambers returning. In upstream area  U1
                                5 filters 50->1 (= one morning).
       

      ALICE TPC : 6 chambers, (3 big, 3 small)  - 2 at the same time, swap takes 45 minutes.
                      moving to test 2 big chambers in parallel
                     test restarted (unshadowed)
                     Total 20-30 (aiming for 6 per week,  1 day flushing, few hours for testing)  - 5 weeks

      Downstream :

      CMS-DT  1/15 campaign until January.

      ATLAS - sTGC :  5-6 chambers should arrive beginning of mid January - half an hour for each chamber
                (might be better compatible with upstream)
                In addition : 1 chamber currently flushed in the preparation area, to be moved into the upstream area next week. (to be confirmed on Monday)
           
      ATLAS-sTGC: downstream,  starting next week, half a day full field
                               swap to be synchronised with ALICE                  
       
      ATLAS-RPC : two gas gap chamber arrived, to stay for January.
    • 09:40 09:50
      New requests for tests at GIF 10m

      introduction, goal of the test, plan, needs

      ALICE - FE Electronic upgrade. To be defined.

      EcoRPC-Gas chambers to be tested with new mixture for RPCs.
      - Discussion about installation ongoing.
       

      Test of sealing material / EN-CV for HL-LHC.
      One copper piece with pipes connected, expected to receive 10Gy, to be tested for 100Gy.

    • 09:50 10:00
      Infrastructure & Upgrades to the Facility 10m

      Improvements needed or planned for the facility.

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      New Items :
      ==========

      VISIT tour !  Next Wednesday 15h-17h as part of the BTTB7 conference.

      Bunker extension :
      ==============

      Bunker layout frozen,  final shape of roof will depend on available blocks.
      Schedule floating, depending on availability of EN services.
      Currently estimated start : Early July.
       

      Ongoing Projects :
      =============

      Correction of Irradiator Signals after power cut.
      Since installation of UPS, the Irradiator signals UNSAFE after a power cut, independently if the source was ON or OFF at the time. In reality, source will always be in safe position after power cut. Power cycle controls in control room to get correct status.

       

      PyTIMBER :

          Additional values need to be collected/republished ?
              - REMUS  - to be included in GIF Display
              - XTDV - to be included in pytimber only

      • LS2 restrictions & interventions 5m

        Restart of gas supply : Monday 7.01 -> DONE

        Access intervention :  next Wednesday morning.

        Update / Restart of the BE/CO infrastructure. 21-23.01

    • 10:00 10:30
      Announcements 30m

      You can subscribe to the calendar with the following link (to be added in you calendar application)
      http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics

      • IMPACTS for 2019 5m

        Guidelines for filling in IMPACT requests

        General Guideline : One IMPACT per setup.

        • two chambers on individual supports -> 2 IMPACT declarations
        • multiple chambers swapped on same or similar support -> one IMPACT declaration
        • basically, if you need two locations, please make two IMPACT declaration (clone)

        Each Setup should have IMPACT label attached with number.
        Attached documents : CAD file  or  picture.
        Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).

        NEW IMPACT needed for 2019 !

      • New Announcements 5m
      • AOB 5m