Building SE17 has been selected as "pilot case" for the production of the control documents and the PVSS-UNICOS coding.
The following documents shall be produced before the meeting:
- The functional matrix
- The process decomposition document
- The I/O list
The result of this exercise shall be presented during the meeting to organise the following steps.