This is a KEK-ATF2 trip report from the December'09 run.
It will cover the current status of ATF2, in particular minimum achieved IP
beam sizes, FFS optics correction and tuning, and lowest emittances at the Damping Ring.
A short description of my ATF2 tasks will also be given.