Coordination: JIRA, Minutes, etc. https://twiki.cern.ch/twiki/bin/viewauth/ProDUNEIT/WebHome

IT-Protodune coordination meeting 14-02-2019

Room: Xavi, Ignacio

Remote: Stu, Denis, Geoff, Bonnie, Steve

IT services update

  • CERN data centres hosts and services is being migrated from Lemon into Collectd. See Lemon retirement presentation: https://indico.cern.ch/event/790238/contributions/3282580/
  • Migration of Phones in control rooms (Monday 18th at the IT-Auditorium): https://indico.cern.ch/event/798121

Round table

  • protoDUNE-DP (Denis)
    • All the optical fibers pulled, tested and certified
    • Continuing tests with line buffer in the dark room
    • Further problems with Wifi in the barracks with unstable connections
  • Questions:
    • Geoff: Georges from the Neutrino platform opened a ticket for the WIFI issues, and two APs were checked -> Denis to be added to the thread and future mails.
    • Xavi: Did the "new" IN2P3 hardware arrived? plans /progress to install a local batch systems? 
    • Denis: Not yet. We have the nodes but need time to work on it.
  • protoDUNE-SP (Geoff)
    • Computing-wise things are stable. Two computers installed to handle the FELIX read-out. Timeline is not clear yet. This computers are not powerful enough and will need to be substituted later on
    •  The goal is to reconstruct the cold-box. They are setting out new fibers
    • Still some HV issues being investigated. They need the readouts from inside the cryostat
    • Getting back to SPSS scheduling and trying to look for a proper slot
    • Introduced Bonnie: Online Computing coordinator and part of the SP DAQ community
    • Stu: We are trying to armonize installation across all the different experiments.
  • Questions:
    • Xavi: Will you explore during this days the switch from Fermi FTS to CERN FTS?
    • Steve: We want to do it but we don't have yet a clear timing for it. The intention is to do it before the 2nd beam run
    • Xavi: (Steve and Jeff) Please thing about the plans long-term for the LS2 road map. Acton to prepare draft planing.
    • Geoff: Need to think about a second data challenge to be have in the upcoming months?
    • Steve: It was discussed during the meeting but there's not a fixed date yet.
    • Xavi: Maybe it could be planned for end of May/beginning of June in order to perform it before DP is expected to be completed (July as target right now).
  • Next Meeting in one months: tentative date 14th March 
There are minutes attached to this event. Show them.
    • 15:00 → 15:20
      Coordination update 20m
      • CERN data centres hosts and services is being migrated from Lemon into Collectd. See Lemon retirement presentation: https://indico.cern.ch/event/790238/contributions/3282580/
      • Migration of Phones in control rooms (Monday 18th at the IT-Auditorium): https://indico.cern.ch/event/798121
      Speaker: Xavier Espinal Curull (CERN)
    • 15:20 → 16:00
      Round-table: status reports 40m

      Elisabetta: All fibers have been pulled and validated in the last two days

      Speaker: All