Weekly summary and plan for the next week :
------------------------
ALICE : 2 big (arriving at end of February) , and 5 small ones to be tested (arriving next)
This week : 7 big ones, 1 small one.
Friday, Saturday, Monday: 8h30 Measurement with att. 1 then 1h access (9h30-10h30)
Tuesday : 8h30-9h30 att.1 for 1h, otherwise 2.2 in upstream field (not needed this week)
Will continue until end of February.
ATLAS-MM : SM2 out, back on Monday morning (during ALICE access)
upstream scan after ALICE (short access around 10h) Tuesday 50-4.6 for 3h.
SM1 (module8)
==> source scan this afternoon : 100-4.6 for 8h
if fine, chamber can go out tomorrow
sTGC with one electronic test chamber - 1 month test, running
2h filter scan (range 2.2-1) upstream Friday and Monday (at 15h)
sTGC Productiuon : return beginning of March
CMS-RPC : installation of electronics for EcoGas, installation of 3 chambers in Trolley 3.
Currently using the default gas mixture for 1-2 weeks.
CMS-RPC trolly 1&3 : Starting next Wednesday 5 night campain, stable condition 6.9 stable.
EP-DT2 : Today filter scan until 12h30, Tomorrow 10h-16, factor 100
Mo : 3h with absorption 100 after lunch.
CMS-RPC :
for the next days - repeatedly : 2h measurement with att. 100, then 2h no measurement (until 18 h)
will continue with different att factors for the next 2 weeks.
LHCb +
CMS-CSC small prototype will move in 1-2 weeks back to downstream
CMS-GEM 1&2
EP-DT1 : Next Thursday downstream 8h-12h full filter range downstream
ATLAS-RPC - 2 setups, IMPACT now available.
Tomorrow : after EP-DT (16h) 2h scans with multiple source off.
Wednesday : after access 2h with multiple stops again.
CMS-DT MB 1&2 - to stopped on 30.01 with 1/15 irradiation.
CMS-CSC + LHCb : using GC tomorrow full day.
EN-CV and ATLAS-NSW samples installed on CMS-GEM (passive irradiation)
We will check for shadowing next week.
introduction, goal of the test, plan, needs
EcoRPC-Gas chambers to be tested with new mixture for RPCs.
- Discussion about mixer rack installation ongoing.
Test of sealing material / EN-CV for HL-LHC.
One copper piece with pipes connected, expected to receive 10Gy, to be tested for 100Gy. -> finished ?
Upcoming BE-BI : test of XBPF in 100Gy steps. Starting soon.
Improvements needed or planned for the facility.
New Items :
==========
AUL test completed successfully on Tuesday morning.
All differential protections tested as well.
Only issue : Extender connected to extender connected....
Ongoing Projects :
=============
Correction of Irradiator Signals after power cut.
Since installation of UPS, the Irradiator signals UNSAFE after a power cut, independently if the source was ON or OFF at the time. In reality, source will always be in safe position after power cut. Power cycle controls in control room to get correct status.
PyTIMBER :
Additional values need to be collected/republished ?
- REMUS - to be included in GIF Display
- XTDV - to be included in pytimber only
News about the ongoing bunker extension
Bunker extension :
==============
Bunker layout frozen, work started already.
Next step : Re-arrange wall behind electrical switchboard
-> Announce power cut NEXT WEDNESDAY 13.02 at 9h for less than 2h.
Currently estimated start : Either early July or early September. (before or after August)
If we want July, we have to push now.
You can subscribe to the calendar with the following link (to be added in you calendar application)
http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics
Guidelines for filling in IMPACT requests
List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154
General Guideline : One IMPACT per setup.
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).
NEW IMPACT needed for 2019 !
Issue with ligth. Button near access door should enable the light for additional 2h.
We plan to keep the light over the GIF area active in the near future (change by EN-EL needed) -> NOT FEASABLE
Locked door on Saleve side.
Proposal top remove the cylinder to avoid the guard locking the door during night times. -> Cylinder HAS BEEN REMOVED