- Compact style
- Indico style
- Indico style - inline minutes
- Indico style - numbered
- Indico style - numbered + minutes
- Indico Weeks View
Help us make Indico better by taking this survey! Aidez-nous à améliorer Indico en répondant à ce sondage !
Weekly summary and plan for the next week :
------------------------
ALICE : 2 big (arriving at end of February) , and 5 small ones to be tested (arriving next)
This week : 4 big ones, 3 small one. Friday, Saturday 8h30 Measurement with att. 1 then 1h access (9h30-10h30) Monday: access only (9h30-10h30) Tuesday : 8h30-9h30 att.1 for 1h Will continue until end of February.
ATLAS-MM : SM2 out - test is over. SM1 (module7) to be install on Monday morning (during ALICE access) near the barrier (outside the cone) for gas flushing and to be tested on Tuesday after Alice Test.
sTGC with one electronic test chamber - 1 month test, running
2h filter scan (range 2.2-1) upstream Friday and Monday (at 15h)
sTGC Productiuon : return beginning of March
CMS-RPC : EcoGas - 5h of source OFF measurements on WED access
CMS-RPC trolley 1&3 : Wednesday 13th measurements started for 5 night campaign, stable condition 6.9 stable. 4.6 att. only for 5 min during the whole test
EP-DT2 : no more source scan needed. Measurements will continue with the GC.
LHCb + setup from upstream removed completely.
CMS-CSC small prototype moved back to downstream in the CMS-CSC trolley
CMS-GEM 1&2
EP-DT1 : need some access (30 min) after the meeting to check some issue with Ar supply
ATLAS-RPC - 2 setups, IMPACT now available.
Today THU 14th : after EP-DT (1.30 pm) 2h scans with multiple source off and stops. To be done before 5pm
CMS-DT MB 1&2
CMS-CSC: using GC
EN-CV and ATLAS-NSW samples installed on CMS-GEM (passive irradiation)
EN-CV samples removed on Monday 11th instead ATL-NSW samples still in. To be remove next week.
introduction, goal of the test, plan, needs
EcoRPC-Gas chambers to be tested with new mixture for RPCs.
- Discussion about mixer rack installation ongoing.
Test of sealing material / EN-CV for HL-LHC.
One copper piece with pipes connected, expected to receive 10Gy, to be tested for 100Gy. -> finished ?
Upcoming BE-BI : test of XBPF in 100Gy steps. Starting soon.
Improvements needed or planned for the facility.
New Items :
==========
Ongoing Projects :
=============
Correction of Irradiator Signals after power cut.
Since installation of UPS, the Irradiator signals UNSAFE after a power cut, independently if the source was ON or OFF at the time. In reality, source will always be in safe position after power cut. Power cycle controls in control room to get correct status.
PyTIMBER :
Additional values need to be collected/republished ?
- REMUS - to be included in GIF Display
- XTDV - to be included in pytimber only
News about the ongoing bunker extension
Bunker extension :
==============
Bunker layout frozen, work started already.
Next step : Re-arrange wall behind electrical switchboard
-> Announce power cut NEXT WEDNESDAY 13.02 at 9h for less than 2h. ->Due to a problem with a breaker upstream, the facility couldn't be restarted before 03.40 pm
Currently estimated start : Either early July or early September. (before or after August)
If we want July, we have to push now.
You can subscribe to the calendar with the following link (to be added in you calendar application)
http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics
Guidelines for filling in IMPACT requests
List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154
General Guideline : One IMPACT per setup.
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).
NEW IMPACT needed for 2019 !
Issue with ligth. Button near access door should enable the light for additional 2h.
We plan to keep the light over the GIF area active in the near future (change by EN-EL needed) -> NOT FEASABLE
Locked door on Saleve side.
Proposal top remove the cylinder to avoid the guard locking the door during night times. -> Cylinder HAS BEEN REMOVED