ATLAS coordination meeting for the PIC cloud (PIC, IFAE, IFIC, UAM and LIP)
Bi-weekly lightweight format meeting, bind to one hour of duration. All the uncovered topics will be collected and covered offline within the mailing list (project-atlas-sw-t1-t2(at)cern.ch) or added to the next meeting.
Agenda topics will be covered only in case relevant info exists.
EVO connection details:
Title: ATLAS PIC cloud coordination meeting
Description: ATLAS coordination meeting for the PIC cloud (PIC, IFAE, IFIC, UAM and LIP)
Bi-weekly lightweight format meeting, bind to one hour of duration
Community: ATLAS
Password: pic2007
Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=MtM8Ma2B2IDnD29t9aDs9t
- Password: pic2007
- Phone Bridge
ID: 1360165
Password: 9839
Huge load during last months. ES cloud running 2.5k-3.0k jobs concurrently. Major upgrade at IFIC, running stably ~700 jobs.
UNfortunatley this week, no jobs to be run at some clouds, clouds ES, DE and FR waiting for load.
ific_month
pictures
simul_status
Plannning LHC re-start5m
This will happen on the 15th of February. Sites are kindly asked to perform major interventions before this date.
Cloud squads5m
Stable team already in place for the PIC cloud.
Past week a tutorial was held in IN2P3:
http://indicobeta.cern.ch/conferenceTimeTable.py?confId=77064#20100115
Do you think a cloud squad tutorial would be useful at PIC cloud ?
11:30
→
11:40
Round table Tier-1 and Tier-2s incidences/status10m