Speaker
Guillaume Devanz
(CEA)
Description
Abstract:
We discuss the behavior of the 1.2 MW power couplers on the ESS medium beta elliptical cavities cryomodule during high power test in the Saclay test bunker. We go through three test conditions, room temperature, cold with detuned cavity and with the nominal case of tuned cavities at 2 Kelvin.
Provocative topic:
Do we condition FPC enough?