01.07.2019 - HL-LHC WP13 BI Meeting 2019 #3 (RF and BI)

Europe/Zurich
866/1-A04 (CERN)

866/1-A04

CERN

15
Show room on map
Rhodri Jones (CERN)
Description

02.07.2019 HL-LHC WP2/WP13 joint meeting on CC performance
https://indico.cern.ch/event/826475/

    • 14:00 14:05
      Approval of minutes and previous actions¶ 5m
      Speaker: Rhodri Jones (CERN)
    • 14:05 14:30
      Beam instrumentation (from RF or BI) required for crab cavity (or new for accelerating cavity) operation (20+5) 25m
      • Direct beam signals required for LLRF?
      • Longitudinal measurements?
      Speaker: Philippe Baudrenghien (CERN)
    • 14:30 14:55
      Possible BPMs for longitudinal phase monitoring (20+5) 25m
      Speaker: Michal Krupa (CERN)
    • 14:55 15:05
      AOB: Modification of HL-LHC D2 BPMs 10m