Tatsushi Nakamoto03/10/2019, 08:00
- Brief introduction of the D1 yoked magnet, the numbers, and the master schedule with the key milestones;
- Description of the assembly breakdown structure, including who is doing what.
-
Tatsushi Nakamoto03/10/2019, 08:15
Description of the interfaces
Go to contribution page -
03/10/2019, 08:30
-
Tatsushi Nakamoto03/10/2019, 08:40
- Description of the Quality plan
- Manufacturing flow chart
- MIP
- Assembly procedures (explain how they evolve in time, i.e. revisions)
- Follow-up sheets
- Acceptance of components
- MTF
- Logistics (explain also how hand over of components is processed with the contractor)
-
03/10/2019, 09:10
-
Tatsushi Nakamoto03/10/2019, 09:20
- Description of the MIP
- Definition of the check points, witness points, hold points. At what stages do we have these points?
- Follow-up sheets - Fiches de suivi
- Steps MTF
- Reference to procedures (and only references)
- Describe how it works at the shop floor level
-
03/10/2019, 09:50
-
Michinaka Sugano03/10/2019, 10:20
- Show one or a couple of examples of manufacturing procedures, e.g. one on cc, another one on cm
- Show one or a couple of examples of inspection procedures, e.g. one on cc, another one on cm
- Structure and content of the procedures
- Describe how they are used at the shop floor level
-
03/10/2019, 10:50
-
Atsushi Horikoshi, Atsushi Horikoshi03/10/2019, 11:00
- BOM
- Need dates
- Follow-up spreadsheet with status/progress
- Contract follow-up, inspection of incoming goods
-
Atsushi Horikoshi03/10/2019, 11:15
- Description of the infrastructure
- List of tooling and availability
- Tooling maintenance
-
03/10/2019, 11:30
-
Tomo Chiba03/10/2019, 11:40
- More details about the production schedule
- Resources loaded schedule
-
03/10/2019, 11:55
-
-
-
-
Diego Perini (CERN)