    • 09:15 09:35
      Review of last week operation & plans for this week 20m

      User Reports / Overview :

      ----------------------------------

      ATLAS - sTGC : 2 chambers (QS1+QS2 ) are out. 1-2 QS2 to be placed today.
                                 1 QS3 + 1 QL2 received, will be placed in preparation area Friday/Monday.

      ATLAS-MM :   SM9 and SM12 in bunker, on universal trolley. Will stay for one more week.
                               Leakage test ongoing. Two new chambers arriving.

      EP-DT1:  Fine. Radiating. Problem with one chamber. Replaced today.
                      Some problem on Saturday with Oxygen (peak suspected), but no measurement on the supply line

      EP-DT2 :  Repeat of measurement : 3h Monday and Tuesday afternoon, short access before/after. filter 22-10

      EcoGas :   HFO bottle should have arrived.  Running.

      CMS-RPC :  Trolley for testing the electronics is installed. Cosmics with background.

                            22-4.6 filter range with 10h scans. as much as possible.
                            1 week program. 22-2.2 for 6h each.
                            For the other trolleys 2.2 requested.
      Gas flow needs to be checked, as we are on the limit.

      CMS-GEM 1&2 :  GEM 2 gas flow seems to be ok now.                                                                                                                          GEM 1:  OFF

      ATLAS-RPC :  BIS  trolley downstream to be removed today. Another trolley BIS to arrive next week.
                               No request for the R&D setup.                

      LHCb :  Fine.

      CMS-CSC:  No request for this week.

      ==========================================================

      Weekly Planning :   https://teamup.com/ksvh7dak8mub8k7xpe

      UPSTREAM : Default filter settings :  2.2 

      DOWNSTREAM :  Default filter settings :  1

      -------------------------------------------------------------------------------------------------------

       

    • 09:35 09:40
      Long Term Planing - General Items 5m

      Irradiator Maintenance : Week 29

      ---------------------------------------------------------

      Gas usage at GIF :  we need to compile a table of gas mixture / consumption

      Gas training courses : ATEX level 1  and F-Gas training courses.
      List of trained people to be collected.
       

       https://lms.cern.ch/ekp/servlet/UNIVERSALSEARCH?ACTION=SEARCH&KEYW=atex 

       https://lms.cern.ch/ekp/servlet/ekp?PX=N&TEACHREVIEW=N&PTX=&CID=EKP000039939&TX=FORMAT1&LANGUAGE_TAG=en&DECORATEPAGE=N

       

      ---------------------------------------------------------

      Next Annual User Meeting :  Proposed day TUESDAY 10.09.2019
      Please let us know if there are particular bad days (ATLAS/CMS weeks etc)

       

    • 09:40 09:50
      New requests for tests at GIF 10m

      introduction, goal of the test, plan, needs

      Gas recuperation system to be installed (end of June) - Responsible : Roberto
      4 additional racks in Gas Service area. One containing flammable gas.
      FG detection system to be installed, power needs to be provided.

    • 09:50 10:00
      Infrastructure & Upgrades to the Facility 10m

      Improvements needed or planned for the facility.

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      New Items :
      ==========

      Cleaning of DCS and installation of UPS : to be scheduled.

      Ongoing Projects :
      =============

      Correction of Irradiator Signals after power cut.
      Since installation of UPS, the Irradiator signals UNSAFE after a power cut, independently if the source was ON or OFF at the time. In reality, source will always be in safe position after power cut. Power cycle controls in control room to get correct status.

       

      PyTIMBER :

          Additional values need to be collected/republished ?
              - REMUS  - to be included in GIF Display
              - XTDV - to be included in pytimber only

    • 10:00 10:30
      Announcements 30m

      You can subscribe to the calendar with the following link (to be added in you calendar application)
      http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics

      • IMPACTS for 2019 5m

        Guidelines for filling in IMPACT requests

        List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154

        General Guideline : One IMPACT per setup.

         

        • two chambers on individual supports -> 2 IMPACT declarations
        • multiple chambers swapped on same or similar support -> one IMPACT declaration
        • basically, if you need two locations, please make two IMPACT declaration (clone)

        Each Setup should have IMPACT label attached with number.
        Attached documents : CAD file  or  picture.
        Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).

        NEW IMPACT needed for 2019 !

      • New Announcements 5m
      • AOB 5m

        Issue with ligth.  Button near access door should enable the light for additional 2h.
        We plan to keep the light over the GIF area active in the near future (change by EN-EL needed) -> NOT FEASABLE

        Locked door on Saleve side.
        Proposal top remove the cylinder to avoid the guard locking the door during night times.  -> Cylinder HAS BEEN REMOVED