GIF++ installation and schedule meeting
-
-
09:15
→
09:35
Review of last week operation & plans for this week 20m
User Reports / Overview :
----------------------------------
ATLAS - sTGC : 2 chambers (QS1+QS2 ) are out. 1-2 QS2 to be placed today.
1 QS3 + 1 QL2 received, will be placed in preparation area Friday/Monday.ATLAS-MM : SM9 and SM12 in bunker, on universal trolley. Will stay for one more week.
Leakage test ongoing. Two new chambers arriving.
EP-DT1: Fine. Radiating. Problem with one chamber. Replaced today.
Some problem on Saturday with Oxygen (peak suspected), but no measurement on the supply lineEP-DT2 : Repeat of measurement : 3h Monday and Tuesday afternoon, short access before/after. filter 22-10
EcoGas : HFO bottle should have arrived. Running.
CMS-RPC : Trolley for testing the electronics is installed. Cosmics with background.
22-4.6 filter range with 10h scans. as much as possible.
1 week program. 22-2.2 for 6h each.
For the other trolleys 2.2 requested.
Gas flow needs to be checked, as we are on the limit.CMS-GEM 1&2 : GEM 2 gas flow seems to be ok now. GEM 1: OFF
ATLAS-RPC : BIS trolley downstream to be removed today. Another trolley BIS to arrive next week.
No request for the R&D setup.LHCb : Fine.
CMS-CSC: No request for this week.
==========================================================
Weekly Planning : https://teamup.com/ksvh7dak8mub8k7xpe
UPSTREAM : Default filter settings : 2.2
DOWNSTREAM : Default filter settings : 1
-------------------------------------------------------------------------------------------------------
-
09:35
→
09:40
Long Term Planing - General Items 5m
Irradiator Maintenance : Week 29
---------------------------------------------------------
Gas usage at GIF : we need to compile a table of gas mixture / consumption
Gas training courses : ATEX level 1 and F-Gas training courses.
List of trained people to be collected.
https://lms.cern.ch/ekp/servlet/UNIVERSALSEARCH?ACTION=SEARCH&KEYW=atex
---------------------------------------------------------
Next Annual User Meeting : Proposed day TUESDAY 10.09.2019
Please let us know if there are particular bad days (ATLAS/CMS weeks etc) - 09:40 → 09:50
-
09:50
→
10:00
Infrastructure & Upgrades to the Facility 10m
Improvements needed or planned for the facility.
Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)New Items :
==========Cleaning of DCS and installation of UPS : to be scheduled.
Ongoing Projects :
=============Correction of Irradiator Signals after power cut.
Since installation of UPS, the Irradiator signals UNSAFE after a power cut, independently if the source was ON or OFF at the time. In reality, source will always be in safe position after power cut. Power cycle controls in control room to get correct status.PyTIMBER :
Additional values need to be collected/republished ?
- REMUS - to be included in GIF Display
- XTDV - to be included in pytimber only-
Bunker Extension Project 10m
News about the ongoing bunker extension
-
Cosmic Trigger 10m
-
10:00
→
10:30
Announcements 30m
You can subscribe to the calendar with the following link (to be added in you calendar application)
http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics-
IMPACTS for 2019 5m
Guidelines for filling in IMPACT requests
List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154
General Guideline : One IMPACT per setup.
- two chambers on individual supports -> 2 IMPACT declarations
- multiple chambers swapped on same or similar support -> one IMPACT declaration
- basically, if you need two locations, please make two IMPACT declaration (clone)
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).NEW IMPACT needed for 2019 !
-
AOB 5m
Issue with ligth. Button near access door should enable the light for additional 2h.
We plan to keep the light over the GIF area active in the near future (change by EN-EL needed) -> NOT FEASABLELocked door on Saleve side.
Proposal top remove the cylinder to avoid the guard locking the door during night times. -> Cylinder HAS BEEN REMOVED
-
-
09:15
→
09:35