    • 09:15 09:35
      Review of last week operation & plans for this week 20m

      User Reports / Overview :

      ----------------------------------

      ATLAS - sTGC :  before yesterday 9 chambers tested and ready to send to 180. 4 QS2 arrived to EHN1 and ready to install inside the bunker. 1 QL2 to be removed today form the bunker. In prinicple from Monday 26th after last test, no chambers expected for 2 weeks.

      ATLAS-MM : Yesterday Wed 21st, 2 SM2 were installed and swapped with 2 SM1. 2 setups installed now. 2 SM2 close to the source (will stay till Monday 26th)  and 1 SM1 far from the source (long term study). Today, in agreement with Katerina we will try to swap the position of CMS-CSC setup and ATL-MM setup, in order to solve the problem of "shadowing" affecting ATL-MM and at the same time find a better position for CMS-CSC setup in term of radiation. 

      CMS-CSC: Chamber ready to be connected. Yesterday all the cooling pipes and the optical fibers were installed back in the original position. 

      EP-DT1:  continue as before, with continuous irradiation from 06pm to 08am every day, with some change on the filter, as described in teamup.

      EP-DT2 : continue as before, no special requests. 

      EcoGas :  no activities until end of August.

      CMS-RPC :  not represented.                

      CMS-GEM 1: not represented.

      ATLAS-RPC :  the setup is still inside due to some delay with the test. 

      LHCb :  not represented.                                              

      ==========================================================

      Weekly Planning :   https://teamup.com/ksvh7dak8mub8k7xpe 

      UPSTREAM : Default filter settings :  2.2

      DOWNSTREAM :  Default filter settings :  1

      -------------------------------------------------------------------------------------------------------

       

    • 09:35 09:40
      Long Term Planing - General Items 5m

      Annual User Meeting :  TUESDAY 10.09.2019

      ---------------------------------------------------------

      Gas usage at GIF :  we need to compile a table of gas mixture / consumption

      Gas training courses : ATEX level 1  and F-Gas training courses.
      List of trained people to be collected.
       

       https://lms.cern.ch/ekp/servlet/UNIVERSALSEARCH?ACTION=SEARCH&KEYW=atex 

       https://lms.cern.ch/ekp/servlet/ekp?PX=N&TEACHREVIEW=N&PTX=&CID=EKP000039939&TX=FORMAT1&LANGUAGE_TAG=en&DECORATEPAGE=N

      ---------------------------------------------------------

      To be scheduled : Stop of Gas supply for 2-3 days : to be scheduled (end of the year / beginning of next year)

    • 09:40 09:50
      New requests for tests at GIF 10m

      introduction, goal of the test, plan, needs

      Gas recuperation system to be installed - Responsible : Roberto
      4 additional racks in Gas Service area. One containing flammable gas.
      FG detection system to be installed, power needs to be provided.
      (DELAYED by a few months. Will be first installed in CMS, and only later come to GIF)

      RD53 setup ?

      Assessment of filter box influence during gamma irradiation test - ESA 

    • 09:50 10:00
      Infrastructure & Upgrades to the Facility 10m

      Improvements needed or planned for the facility.

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      Ongoing Projects :
      =============

      PyTIMBER :

      New improved data plotting and data export

      Please check it at https://epdtdi-pytimber.web.cern.ch/app/gifpp  

      • LS2 restrictions & interventions 5m
      • Cosmic Trigger 10m
    • 10:00 10:30
      Announcements 30m

      You can subscribe to the calendar with the following link (to be added in you calendar application)
      http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics

      • IMPACTS for 2019 5m

        Guidelines for filling in IMPACT requests

        List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154

        General Guideline : One IMPACT per setup.

        • two chambers on individual supports -> 2 IMPACT declarations
        • multiple chambers swapped on same or similar support -> one IMPACT declaration
        • basically, if you need two locations, please make two IMPACT declaration (clone)

        Each Setup should have IMPACT label attached with number.
        Attached documents : CAD file  or  picture.
        Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).

      • New Announcements 5m

        The GIF++ facility won't be operational during the weekend of the CERN Open Days (14/15 September)

      • AOB 5m