Present: Fanouria, Alan, Chiara, Michele,GP, JF, Simon, Federico, Bettina, Piotr
 
  • Action for all: check new version of chapter on optics measurements and corrections
    • Piotr specified the need to have a Dp/p of 2E-3 for some of the optics measurements. According to initial specifications, 4.4e-3 RMS is the max Dp/p (energy swing). To be measured during LBE run.
  • Document on Pre-LS2 beams to be filled by people appointed by Bettina. To be finished by this year (CERN note which might become a publication)
  • LIU-CCC: tracking across the injector complex (machine specific data tracking and performance tracking per beam type). For PSB, different beams transverse and longitudinal emittance, ejected and extracted intensity, spill quality. What about losses? Sum of all ring BLMs and extraction and transfer? To be clarified with LIU-CCC if it can be considered a quality tracking
 
Simon - PROBE/INDIV production
 
From PSB beam commissioning meeting: losses during shaving for RP considerations, any optimisation possible to minimise the losses?
 
  • It is possible getting the wished LHCINDIV intensity with one cavity
  • Changing intensity requires to change also the injected length and the number of turns. 
  • Keep the specified emittance means changing the energy spread and/or the voltage.
  • The chopper limits should be re-checked to evaluate the minimum allowed injected length.
Proposal: inject just a little extra-intensity and shave only what needed to reach the target.
Expected that all losses will occur at 200 MeV at the end of shaving, upper bound ~2E10 protons for operational beams.
If one considers 300 ns as minimum injected length one has to inject 4.5E10 and to get the PROBE (0.5E10) we would lose ~4E10.
For RP: losses for PROBE/INDIV production between 2E10-4E10.
There are minutes attached to this event. Show them.
    • 09:00 → 09:20
      Open Actions, Document Status, News 20m

      Status of documentation:
      * Piotr updated the chapter on the "optics meas. & corr."
      * Max Dp/p to be measured during LBE run?

      Paper on pre-LS2 beam production

      Re-check list of variables in Verena's presentation at the last LIU-CCC just to make sure about the content (slide 3 of https://indico.cern.ch/event/841490/contributions/3530531/attachments/1896446/3128954/PerformanceTracking_LIUCCC_Aug2019.pdf)

      Previous list available at

      Speakers: Chiara Bracco (CERN), Gian Piero Di Giovanni (CERN)
    • 09:20 → 09:40
      PROBE/INDIV Production 20m

      For the RP simulations concerning LHCINDIV losses:

      1) How much losses will we have with your proposed beam production scheme? This should correspond to the worst case, meaning LHCINDIV going up to 30e10 p extracted intensity.

      2) Rough estimate on the factor we could gain in the losses if we would move from your preferred shaving scheme to one where we reduce the number of injected turns (only a rough estimate is fine).

      Speaker: Simon Albright (CERN)