To summarize :
As the magnetic measurement shaft could not be ready for QXF Proto test in Sm18, the decision concerning the quench location shafts was to build a new system.
Infos :
Gerard with help of Lucio will work for this new system. This system not needs to be RIGID as MM shafts.
This system should group LQA and MM shaft. And as MRU is not necessary, it could have lot of signals (HF DAQ used)
In the case of no shaft ready, the HQ short shaft should be used for local quench (Bertrand, Abdelhay and Fred.F will work to “restore” this shaft with Gerard requirements)
Gilles and Fabien offered to help, if necessary, to build this new system.