PASTE meeting

→ Europe/Zurich
2-R-014 (CERN)

2-R-014

CERN

Andrei Tsaregorodtsev
Description
CERN, bat 2 R-014 To join the telephone conference, click here: https://audioconf.cern.ch/call/0165202 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0165202
Production and PASTE Meeting, 23rd February 2010, CERN Chair: A.Tsaregorodtsev Minutes: S.Paterson CERN: P.Charpentier, J.Closier, Z.Mathe, S.Paterson, M.Rashid, V.Romanovski, R.Santinelli, A.C.Smith, F.Stagni Phone: R.Graciani, E.Lanciotti, R.Nandakumar, A.Tsaregorodtsev Apologies: M.Sapunov 0. Ongoing Action List #11163 - Site summary pages - Federico commented that work has started after the circulation of the site summary proposal. Hopefully something should be available next week. #12165 - Hardware metrics - the sensors from last October will be resurrected in the Quattor template, volhcb16 will be used for testing. #12382 - Site status view in the Web Portal - merged with #11163 #13029 - Develop periodic testing infrastructure in SAMSystem - ongoing. #13347 - Follow updates to CORAL LFC interface - the fix is being tested by Marco prior to release. #13348 - Update downtime calendar to use GOCDB interface - ongoing. #13403 - DIRAC Web Portal at PIC - Matvey had a suggestion to use a Nginx server to dispatch the queries for better load balancing between PIC and CERN. #13404 - FTS+WMS client middleware in LCG-AA - closed. #14096 - Date in RawIntegrityMonitor - Fixed, action closed. #13405 - Keeping Real Data on disk at CERN - It was agreed to pursue adding a new workflow module to re-register data at CERN after processing. #13406 - Testing data access with xrootd protocol - Andrew is starting to think about the testing infrastructure for data access protocols. 1. Production Status Report - Current productions MC has ramped up with requests for ~18M events (~40k jobs) all running smoothly. The physics stripping of the last L0HLT1 pass is proceeding for the minimum bias but even for 1 file per job there are many stalled jobs (58 stalled / 102 done and 342 still running). The b and c inclusive samples may have to be rerun to ensure small enough file sizes. 2. DIRAC Release Update - DIRAC v5r0 and patch releases Since the v5r0 release there have been a couple of patch releases for minor problems in several subsystems. Zoltan confirmed that the recent fixes to the BK were working in production. Andrei suggested that everyone should look at the tagging procedure for the next releases, in addition to a meaningful tag name the versions.cfg file should be updated and release notes be added. The next release (v5r1) will include a new SystemAdministrator interface and service to better manage the DIRAC components. - New production system migration post-mortem Andrei reported that the migration was fairly smooth apart from a few minor fixes as needed during the morning. By noon Wednesday all the services were up and the configuration master was switched over. By 5pm on Wednesday the DIRAC v5r0 migration was ready. After the Ganga patch release there were no problems for users. Since the MC ramped up recently to 10k jobs the load on the central machines was observed to be very reasonable. The memory consumption of the Service and Agent hosts was ~ 4.8 GB which is well below the limit of 16GB. To conclude the new DIRAC setup has a much larger capacity for load. - Next steps Ricardo summarised the progress on database mirroring to ensure a periodic backup is available in case of failures. The initial mirror can be installed on volhcb25. In the future the procedure for backups and the possibility for hot-swap machines will be investigated. Joel asked whether some of the old machines can be retired, particularly volhcb06, the LogSE. It was agreed to copy over everything from the old LogSE and then the cleaning can start on the new LogSE. The final list of hosts to be retired are: volhb04, 06, 08, 09 and 10. volhcb12 is used for development and volhcb11 is an old web portal that will move to volhcb17. volhcb13 can be migrated to SLC5 and be used for hosting the CERN web portal. 3. DIRAC Tasks - Infrastructure monitoring (SAM,SLS,Dashboard) Roberto updated the root macro test to better track down incompatibilities. The periodic tests have been consolidated to work with the latest DIRAC version and all seem reliable. - ResourceStatus System status Discussed above. - Framework status All the agents have been migrated to the new framework. Andrei mentioned that many commits were made recently using the eclipse debugging tool, these should be carefully checked. The SystemAdministrator service allows to restart services and install software. - Bookkeeping status No updates from Zoltan. - WMS status Ricardo commented that a new reworking of the WMS is being planned. The CNAF CE direct submission will be pursued as discussed in the production operations meeting, Roberto will also look into an update of the site occupancy factor of the ranking expression. - DMS A plugin to allow merging by file types will make the streaming for the stripping much easier. - Production Management status There was a small update to the production status machine in order to treat associate transformations in addition to MC and merging. - VO-boxes An extra service to allow to run the VO-boxes themselves will be deployed and tested. - Documentation The API documentation (Epydoc) was updated and is available as PDF / HTML from the DIRAC menu. 4. AOB Roberto mentioned that the discussion following the recent Castor problems has highlighted a need for us to get in touch with sites outside of working hours (without using ALARM tickets). The official routes to report problems i.e. GGUS team tickets, don't trigger the same effect as a mail to Castor support. Joel just circulated an announcement of an intervention on Castor LHCb at CERN. Raja mentioned a similar event at RAL.
There are minutes attached to this event. Show them.
    • 09:30 → 10:00
      Ongoing actions 30m 2-R-014

      2-R-014

      CERN

      The task list is available via the Savannah DIRAC group ( Task List ). If you are not already registered please do so at the Savannah page. In order to streamline the time spent during PASTE on the actions list only tasks in the status 'ToBeDiscussed' will be discussed there. In case some actions fall by the wayside they will automatically be updated to this status. Therefore the action assignees should take care to update this. For ongoing actions it is advantageous to report any progress in the Savannah tasks each week.
    • 10:00 → 10:30
      Production issues 30m
      - Current productions
    • 10:30 → 10:50
      DIRAC Release Update 20m
      - DIRAC v5r0 and patch releases - Upcoming releases - New production system migration post-mortem - Next steps
    • 10:50 → 11:20
      DIRAC tasks 30m
      - Infrastructure monitoring (SAM,SLS,Dashboard) - ResourceStatus System status - Framework status - Bookkeeping status - WMS status - DMS status - Production Management status - VO-boxes - Web Portal - Services deployment ( hardware, configuration ) - Documentation
    • 11:20 → 11:30
      AOB 10m 2-R-014

      2-R-014

      CERN