The objective of this meeting is to provide a picture of the current activities of the group about dynamic simulations using EcosimPro software with the CRYOLIB library. Four sections are currently using EcosimPro (OP,CE,ME,ML) and each of them gave a short summary.
OP (Benjamin)
- Operator training in B36. Currently under upgrade. To be re-commissioned before new operator arrivals (April 2020)
- Beam screen dynamics studies with validation of the new Feed-Forward controls allowing a smooth deployment on the real machine.
- New control in QURC AL (LS2): virtual commissioning of the cold compressor control. 15h instead of more than 100 hours of operation without risk.
- Simulation of HL cryogenics validation of the LSS of P1 and P5 but we need the data of string to confirm the results.
- Foreseen development: Enlarge cryo simulation lab with atlas-MR. New DFB control validation (Stagiaire with CE)
CE (Marco)
- Virtual Commissioning of control system (Bat165)
- SM18 CFB cooldown. Compare different control approaches taking into account flow, temperature and pressure constraints.
- B279 CP Fuzzy PI pressure controller.
ML (Philippe)
- Preserve roberta’s work: Fault Diagnostic and Isolation. Many small case studies done. To be seen how to apply this to operation.
- Optimize the Test facilities
- Train operators
- Forecast usage: want to use EcosimPro to develop/validate controls when the process dynamics plays an important role.
ME (Andreas)
- Objective of ME was to asses EcosimPro for some safety analysis and to reproduce some dynamic thermo-mechanical effects
- Study done on quench relief valves on the String 3
- Benchmark of safety relief scenarios
- HL LHC thermal design of Inner triplet Helium evaporator pots
- Benchmark development for safety valves on transfer lines.
There are minutes attached to this event.