CERN, bat 2 R-014 To join the telephone conference, click here: https://audioconf.cern.ch/call/0165202 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0165202

Production and PASTE Meeting, 16th March 2010, CERN

Chair:  A.Tsaregorodtsev
Minutes:  S.Paterson

CERN:  P.Charpentier, J.Closier, R.Nandakumar, S.Paterson, M.Rashid, R.Santinelli, A.C.Smith, F.Stagni
 
Phone:  V.Fernandez, R.Graciani, E.Lanciotti, M.Sapunov, A.Tsaregorodtsev

Apologies:  Z.Mathe, V.Romanovski


0. Ongoing Action List

#10907 - Steer the CPU related activities in DIRAC, move to the HEP CPU units - In the latest release we support HEP-SPEC 2009 units, the pilots are providing the normalised CPU (to 1 HEP-SPEC 2009).
#10916 - Formalize and simplify the release procedure for new web portal pages - The LHCb specific data portion of the configuration is separated. Ongoing.
#11163 - Site summary pages - Federico discussed the evolution of the page with Matvey last week, a prototype is expected at the end of this week.
#11223 - Demonstrate pilot submission through the CREAM CE - A GridFTP server was set up at CERN and this is being tested.
#12165 - Formulate hardware metrics and actions for VO-box lemon sensors - Jiri's agent is in SVN, developments are ongoing.
#13347 - Follow updates to CORAL LFC interface - No news as of yet.
#13405 - Keeping Real Data on disk at CERN - Joel reported that the new disk is in place.
#13407 - Detection of the platform and capability - Ongoing, a new utility to bind all usage of LbLogin / SetupProject is being prepared.
#14213 - Web Portal Notifications handling - Federico mentioned there are refinements being made to the notifications lifetime e.g. automatic cleaning. Ongoing.
#14500 - DIRAC tools independant of the VO - A fix was prepared for the distribution of other VOs.


1. Production Status Report

- Current productions
The L0HLT1 stripping was relaunched for b and c inclusive.  There will be a couple of physics stripping productions following the commissioning of the new LogSE.

- Update VO-box document
See document attached to today's agenda.  Andrei updated the VO-box requirements to include a port for the system administrator service and the possibility of adding a SQUID service.

- Lemon DIRAC sensor
See action #12165.


2. DIRAC Release Update

- LHCb/DIRAC v5r1
Andrei mentioned that the v5r1 release was deployed for the production system. The new graphics package has been deployed with some strange side-affects that will be investigated.  All other features are listed in the release notes.  There will be a release for the new monitoring developments towards the end of this week, in time for the jamboree.

- Externals v5r1 release
The binaries for the v5r1 release are being prepared to support the web server configuration, these must be compiled for all supported platforms.


3. DIRAC Tasks

- Infrastructure monitoring (SAM,SLS,Dashboard)
Roberto has received the code from Andrew and is updating the SAM sensors to improve readability.

- ResourceStatus System status
Federico has made a few bug fixes for the present release and developments are ongoing for the Tier-1 jamboree.

- Framework status
Ricardo made a small fix to the Subprocess module.

- Bookkeeping status
Philippe mentioned there are some renaming operations pending after the Online information contained typos.

- WMS status
No major updates, minor fixes here and there.

- DMS status
Philippe reported no objections were received regarding the DC06 cleanup and suggested to start removing lumi5 samples.

- VO-boxes
Document was discussed as above.

- Services deployment ( hardware, configuration )
Raja is testing the port

Roberto mentioned that he is  happy to be a guinea pig for the new protocol access testing script, Stuart will send the details.


4. AOB

Philippe raised the point about speakers for the Tier-1 jamboree circulating drafts of their slides by the end of the week in order to present a consistent front and agreed to send a mail.

The starting point for the daily meetings was mentioned, tentatively it was agreed that these begin in two weeks.  Philippe agreed to circulate a summary of the offline discussions to the lhcb-grid list.  The GEOC will chair the daily meetings and attend the service meeting in the afternoon.

There are minutes attached to this event. Show them.
    • 09:30 → 10:00
      Ongoing actions 30m 2-R-014

      2-R-014

      CERN

      The task list is available via the Savannah DIRAC group ( Task List ). If you are not already registered please do so at the Savannah page. In order to streamline the time spent during PASTE on the actions list only tasks in the status 'ToBeDiscussed' will be discussed there. In case some actions fall by the wayside they will automatically be updated to this status. Therefore the action assignees should take care to update this. For ongoing actions it is advantageous to report any progress in the Savannah tasks each week.
    • 10:00 → 10:30
      Production issues 30m
      - Current productions - Update VO-box document - Lemon DIRAC sensor
      document
    • 10:30 → 10:50
      DIRAC Release Update 20m
      - LHCb/DIRAC v5r1 - Externals v5r1 release
    • 10:50 → 11:20
      DIRAC tasks 30m
      - Infrastructure monitoring (SAM,SLS,Dashboard) - ResourceStatus System status - Framework status - Bookkeeping status - WMS status - DMS status - Production Management status - VO-boxes - Web Portal - Services deployment ( hardware, configuration ) - Documentation
    • 11:20 → 11:30
      AOB 10m 2-R-014

      2-R-014