RAL Tier1 Experiments Liaison Meeting
Access Grid
RAL R89
Please attend via the following Zoom meeting:
https://ukri.zoom.us/j/98562731547?pwd=UU9Wb2xCL05tWmROT1h6SUlWdUJ3dz09
-
-
13:38
→
13:39
Major Incidents Changes 1m
-
13:39
→
13:40
Summary of Operational Status and Issues 1mSpeakers: Brian Davies (Lancaster University (GB)), Darren Moore (Science and Technology Facilities Council STFC (GB))
-
13:40
→
13:41
GGUS /RT Tickets 1m
https://tinyurl.com/T1-GGUS-Open
https://tinyurl.com/T1-GGUS-Closed -
13:41
→
13:42
Site Availability 1m
https://lcgwww.gridpp.rl.ac.uk/utils/availchart/
https://cms-site-readiness.web.cern.ch/cms-site-readiness/SiteReadiness/HTML/SiteReadinessReport.html#T1_UK_RAL
http://hammercloud.cern.ch/hc/app/atlas/siteoverview/?site=RAL-LCG2&startTime=2020-01-29&endTime=2020-02-06&templateType=isGolden
-
13:42
→
13:43
Experiment Operational Issues 1m
-
13:44
→
13:45
VO-Liaison ATLAS 1mSpeakers: James William Walder (Science and Technology Facilities Council STFC (GB)), Dr Tim Adye (Science and Technology Facilities Council STFC (GB))
WN Slots - Modification to slots count for tranche
- https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=381995MCTape deletions; slow deletions, affecting overall deletion rate:
- https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=382696
Deletions at 0.3Hz, taking 3s per request (suspiciously exactly 3.0s)
Much slower than other T1s (~4Hz); reaper has similar configuration for all T1sSheffield;
Struggling to stage / transfer jobs properly. Likely to be site issue, but should also try to exclude RAL as source of issues.TPC-http;
Final FTS failure modes understood. due to number "/" being used in URI;
with "//" leads to discrepancy between pool:object name and generated macaroon token name -
13:46
→
13:47
VO Liaison CMS 1mSpeaker: Katy Ellis (Science and Technology Facilities Council STFC (GB))
RAL Tape is not being used for CMS as we have hit pledge. There is some cleaning up to do on the CMS side following the Rucio transition. I believe CMS still has spare tape at other sites, so it is not a desperate situation. It was mentioned at the PMB that ~1PB might be offered if CMS requested, so I have passed this on.
Because no files are going to tape, and load tests are not yet up and running, our FTS status is in error. Disk transfers look ok though. We should not go into drain because the status has been manually overridden.
I asked Rob A about running the Echo file dump ~daily for a few days while the procedure for consistency checking is tested. He agreed in principle, I don't know when this will happen yet, it depends on my FNAL colleague.
I am keeping in touch with the ongoing CTA migration, and investigating adding load tests. I am thinking about future tests for Production CTA for CMS.
No progress on the IPv4 slowness. However we are running Processing jobs this week and the CPU efficiency has been good. Perhaps the data is all Onsite? But I have no way to properly monitor this and a change to monitoring is not going to happen in the next few months.
-
13:48
→
13:49
VO Liaison LHCb 1mSpeaker: Raja Nandakumar (Science and Technology Facilities Council STFC (GB))
LHCb:
Streaming from ECHO
- Any news about schedule for fix to xrootd-CEPH plugin?
- Fix to arc-ce05 just rolled out to run jobs on LHCb test nodes only
- Waiting for stable baseline before proceeding.
- Want to test out effect of low values for block sizes to see if that alleviates the problem
DUNE
Quite a few jobs in the last week
- But very few right now
ETF testing getting more sites into the "green" territory
- Not all sites in ETF home page are in production
-
13:52
→
13:53
VO Liaison Others 1m
-
13:53
→
13:54
Experiment Planning 1m
-
13:54
→
13:55
Dune/protoDune 1m
-
13:55
→
13:56
Euclid 1m
-
13:56
→
13:57
SKA 1m
-
13:57
→
13:58
AOB 1m
-
13:58
→
13:59
Any other Business 1mSpeakers: Brian Davies (Lancaster University (GB)), Darren Moore (Science and Technology Facilities Council STFC (GB))
-
13:38
→
13:39