News: Issues with Nxcals and LSA. Concerns about continuation of sdds files.
Lukas: Beta-beating for the ramp with high telescopic factor
Issues with timing of the Ac dipole kicks. Outlayers in beta-from-phase dissappear in beta-from-amplitude.
At 2.7 TeV the fact that the measurement was at different energies shows an assymetry between IR1 and IR5 telescope. It could be that telescope does not go in parallel.
Stephane will pass Lukas an optics closer to the actual measurement. To be compared to see if Matteo should be contacted.
Stephane mentions that the beta-beating in IR3, IR7 and IR6 are the key for performance. He asks for the peak-beating in these IRs.
For 2021 either 3 bunches or stopping in the ramp would allow efficient commissioning.
Josch: dedicated weights at locations -> possible combined with phase constraints (e.g. MKD - TCT)
Josch: Automate kicks to aim match points should be planned.
Getting optics settings at any time in the ramp should be possible in 2021.