Gas systems project
GAS M&O meeting 16 April 2020
Present: Beatrice, Roberto, Andrea, Patrick, Kacper, LPh, Fred, Michal, Mara, Gianluca, Sabino, Fabio, Federico, Leonardo
Indico: https://indico.cern.ch/event/909752/
CHECK Gas Systems
ALICE
TPC
- by mistake LPh started the cO2 absorber and we have a big loss of gas. Problem fixed by piquet
TRD
- two stops due to profibus problem but able to restart as system
- Patrick and Fred went on place: found two profibus connectors not well closed. These connectors were installed with the new PLC
- Profitrace installed in place to check for other possible problems
ATLAS
- nothing to report
CMS
- Lower of gas flow for the chilled mirror of the humidifier
- Humidifier of RPC is stable because is not injecting any water. This is due to the fact that we don’t use the purifiers
- DT pump maintenance: change of membrane for pump 1 and 3
- Ar/Co2 batteries almost empty. New batteries already at P5
LHCb
- nothing to report
GENERAL
- Chilled mirror needs between 10 and 20 l/h. The lower is the flow, the higher is the time to perform the measurement
- Profibus check has to be done before and after the change of PLC
- Summary of status of alarms done by Mara
- Level of PGS sometimes is > 100% —> Michal to check
- PGS list of sensors not working/not existing: missing ALICE, CMS and LHCb
Actions:
- To prepare a list of sensors not working or missing in PGS —> Experiment technical responsible
- Excel file for alarms prepared weekly by Mara —> Experiment technical responsible to fill
-
-
09:00
→
09:10
SMS alarms from gas systems 10mSpeaker: Mara Corbetta (Universite Claude Bernard Lyon I (FR))
link to weekly SMS alarms
link to gas system checklists
https://espace.cern.ch/gas-control/_layouts/15/start.aspx#/Shared%20Documents/Activities/GasSystemsChecklist/
-
09:10
→
09:20
Reminder of activities to do at the re-start 10mSpeakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Kacper Jerzy Kapusniak (CERN), Louis-Philippe De Menezes (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR)), Michal Zbigniew Zimny (CERN), Patrick Carrie (CERN), Roberto Guida (CERN), Sabino Zagaria (Universita & INFN Pisa (IT))
ALICE
CPV
- We have 3 lines input that are ok, and 3 lines output: in one there is not the return. LPh contacted Yuri
TPC
- In the purifier the small thermic box triggered (also last year it happened) —> Patrick/LPh to check
TRD
- Recuperation: missing two valves but there are present in the software
- Purifier: to review if keep the safety valve or the rupture disk
- Purifier: safety valve at the input where we have Ar or Ar/H2 at high pressure —> LPh to check with safety
ATLAS
MDT
- Check overpressure in MDT chamber when there is a stop-start of the system
- Only one convertisseur, one pump, etc from the system —> Patrick/Kacper to fix
- Found a problem of grounding on pressure sensors: pressure sensors changed. Now to verify if the grounding problem is still there
- Problem in the 2 vaisala of humidifier: several spikes present. Not clear why. Before the software upgrade they were not present
RPC (Fred)
- Move the IR analyser inside the Exhaust module
- Fill the 3rd purifier?
CMS
RPC
- Michal changed the mother board in rack 67: now flow is 170 l/h (elog #2279) —> Andrea to check with new voegtlin red
- (Mara) Isobutane 5% calibration for IR and GC
- (Fred) Change product Purifier 1 & 2 and fill purifier 3?
DT
- Change one motherboard in rack 61 but flow didn’t change (elog #2280) —> to try to recalibrate one set of flowcells
- Difficult to re-start the gas system after power-cut —> to do some tests
- Test for power cut and re-start for the exhaust line —> to do other tests
GEM
- Andrea prepared a drawing for ME0 and check for space in UX —> Andrea to send an email to Michele
CSC
- On-going regulation of PID for the exhaust —> Beatrice
- Warning to set-up —> Beatrice/Michal/Roberto
- canbus cable to be replaced (elog #2320)
CF4 Recovery (Mara)
- MFCs Installation
- Fix leaks column B CF4 adsorber
- Install new storage battery
- Test new compressor
LHCb
MWPC
- Problem in the GC analysis of the mixer: not visible the correct gas mixture with both LF and HF. Probably an hardware problem (connection, valve, etc) to find —> Mara
- Leak in Mixer and Exhaust. Only in Exhaust found but not repaired. Other not yet founded —> Patrick
RICH2
- To inject Air —> Patrick to check with C. Frei
- To add line for analysis “supply to detector”k
- (Mara) Ageing test of CO2 IR module
- (Mara) GC analysis of recuperated CF4
SciFi
- Problem on 3-ways valve —> Patrick
PGS
- Interlock of Ar/H2 does not work —> Michal/Patrick to check
GENERAL
- Alarms/Errors in power supplies for all gas systems —> Patrick
- PROFIBUS check before and after the change of PLC —> Michal + somebody else
- (Mara) Ageing test of black flowmeters Omron
-
09:20
→
09:30
M&O and project organization 10mSpeakers: Beatrice Mandelli (CERN), Roberto Guida (CERN)
-
09:30
→
09:40
Overview of planning LS2 10mSpeaker: Beatrice Mandelli (CERN)
-
09:40
→
09:45
Piquet interventions 5m
http://eloggas.cern.ch/GAS_PIQUET/
Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Kacper Jerzy Kapusniak (CERN), Michal Zbigniew Zimny (CERN) -
09:45
→
09:50
Activities on-going 5mSpeakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN)
-
09:50
→
10:10
Plan of LS2 activities 20mSpeakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN), Roberto Guida (CERN)
-
10:10
→
11:35
Gas systems for the LHC experiments
-
10:25
ALICE 5mSpeaker: Louis-Philippe De Menezes (CERN)
-
10:30
ATLAS 5mSpeaker: Kacper Jerzy Kapusniak (CERN)
-
10:35
CMS 5mSpeaker: Andrea D'Auria (CERN)
-
10:40
LHCb 5mSpeaker: Patrick Carrie (CERN)
-
10:45
Gas analysis: standard H2O/O2 5mSpeaker: Louis-Philippe De Menezes (CERN)
-
10:50
Gas web-page 5m
http://test-gasmonitoring.web.cern.ch
https://ep-dt-gasanalysis.web.cern.chSpeaker: Beatrice Mandelli (CERN) -
10:55
Software 10mSpeaker: Michal Zbigniew Zimny (CERN)
-
10:25
-
11:35
→
12:25
Gas System developments
-
11:35
Gas System Test-Bench 10mSpeakers: Fabio Bordon (CERN), Sabino Zagaria (Universita & INFN Pisa (IT))
-
11:45
CMS CF4 recovery 10mSpeakers: Fabio Bordon (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
-
11:55
LHCb RICH2 CF4 recuperation 10mSpeakers: Federico Consolaro (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
-
12:05
R134a Recuperation 10mSpeakers: Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Ian Crotty (University of Wisconsin Madison (US)), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
-
12:15
AoB 10mSpeakers: Fabio Bordon (CERN), Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Mara Corbetta (Universite Claude Bernard Lyon I (FR)), Sabino Zagaria (Universita & INFN Pisa (IT))
Working folder for Checklists of ATLAS, ALICE, CMS, LHCb:
https://espace.cern.ch/gas-control/Shared%20Documents/Activities/GasSystemsChecklist
Checklist for ALICE:
https://espace.cern.ch/gas-control/Shared%20Documents/Activities/GasSystemsChecklist/ALICE/ALICE_checklist.xlsx?Web=1
Exported Alarms for all systems in ALICE (todo):
https://espace.cern.ch/gas-control/Shared%20Documents/Activities/GasSystemsChecklist/ALICE/ALICE_alarms_toreview.xlsx?Web=1
Checklist for ATLAS:
https://espace.cern.ch/gas-control/Shared%20Documents/Activities/GasSystemsChecklist/ATLAS/ATLAS_checklist_v2.xlsx?Web=1
Exported alarms for all gas systems in ATLAS (on going):
https://espace.cern.ch/gas-control/Shared%20Documents/Activities/GasSystemsChecklist/ATLAS/ATLAS_Forced-Blocked.xlsx?Web=1
-
11:35
-
12:25
→
12:35
FSU & Jobs status 10mSpeaker: Frederic Merlet (CERN)
-
12:35
→
12:45
AoB 10mSpeakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Roberto Guida (CERN)
-
09:00
→
09:10