GAS M&O meeting 23 April 2020

Present: Beatrice, Roberto, Andrea, Patrick, Kacper, LPh, Fred, Michal, Mara, Gianluca, Sabino, Fabio, Federico, Leonardo

Indico: https://indico.cern.ch/event/910393/

 

 

CHECK Gas Systems

 

ALICE #2411

TOF

  • GC analysis: SF6 at 6%

TRD

  • several problems with profibus: change of 9 connectors: https://eloggas.web.cern.ch/GAS_PIQUET/1050
  • Profitrace didn’t work because memory was saturated: to investigate how to do
  • check of profibus before and after replacement of the connectors: everything looks ok. Then Patrick changed the profibus connectors where the resistance was bad
  • Also PT1009 in the mixer has a electrical isolation default and it was changed (in WinCC-OA the value was correct)
  • In WinCC-OA we saw peaks in the mixer node (https://eloggas.web.cern.ch/GAS_PIQUET/1048): this can be used as indicator of profibus problems —> Michal to check how to implement in WinCC-OA
  • Patrick/Michal to prepare a presentation of profibus test and spikes in mixer node

 

ATLAS #2410

MDT

  • Still overshoot in pressure when system is re-started. Need to investigate on place when we are back. In the meanwhile to prepare a summary —> Kacper and Gianluca
  • pump at 100% at the re-starting, no problem
  • distribution: problem in sensors rack 66ch16 and rack63ch16. To do a reset when we are back. To prepare a list of sensors that stop to work or drift in order to have a clear overview —> Kacper
  • several warning received on the drift of pressure sensor PT6304ch16: these are due to the not working sensor. These warnings are useful for ATLAS system but not for the piquet —> Michal to investigate if we can have two lists of warnings: one for the piquet (very important for operation and to anticipate interventi to avoid a stop of the system) and one for standard operation

PGS

  • after power-cut, problem with level transmitter on N2 dewar, solved by cleaning the connector. David already contact since also cables are not in good status

 

CMS #2412

RPC

  • with the power-cut some racks went underpressure -2 mbar, this is probably due to leaks in the detectors —> Andrea to prepare list of racks with this problem

DT

  • after a power-cut we need to increase the flow in the mixer because we loose a lot of pressure in the buffer —> to investigate when we are back

 

LHCb #2406

  • no power-cut, only lost of communication with PLCs
  • RICH1 pump cooling, on-going (email of 19/03)

 

GENERAL

  • Discussion on PROFIBUS:
    • Profibus check has to be done before and after the change of PLC but it is not enough
    • Need to test all resistance in profibus connectors. Not done for all system where we changed the PLC —> to plan to do
    • Test on Profibus status in OT in order to have a procedure of all tests needed
    • To check how to implement in WinCC-OA an alarm/warning when we have peaks in the profibus node (example https://eloggas.web.cern.ch/GAS_PIQUET/1048) —> Michal
    • Patrick/Michal to prepare a presentation of profibus test and spikes in mixer node
  • Discussion on warnings:
    • To investigate if we can have two lists of warnings: one for the piquet (very important for operation and to anticipate interventi to avoid a stop of the system) and one for standard operation —> Michal

From previous meeting:

  • Level of PGS sometimes is > 100% —> Michal to check
  • PGS list of sensors not working/not existing: missing ALICE, CMS and LHCb

 

ACTIONS:

  • Patrick/Michal to prepare a presentation of profibus test and spikes in mixer node
  • Gianluca/Kacper to prepare a summary of ATLAS MDT pressure overshoot problem
  • Kacper to prepare a table of ATLAS MDT pressure sensors with problem and keep it updated
  • Michal to check if we can have two egroups for the warning

From previous meeting:

  • To prepare a list of sensors not working or missing in PGS —> Experiment technical responsible
  • Excel file for alarms prepared weekly by Mara —> Experiment technical responsible to fill

 

 

 

REMINDER for when we will be back

 

ALICE

CPV

  • We have 3 lines input that are ok, and 3 lines output: in one there is not the return. LPh contacted Yuri

TPC

  • In the purifier the small thermic box triggered (also last year it happened) —> Patrick/LPh to check

TRD

  • Recuperation: missing two valves but there are present in the software
  • Purifier: to review if keep the safety valve or the rupture disk
  • Purifier: safety valve at the input where we have Ar or Ar/H2 at high pressure —> LPh to check with safety

 

ATLAS

MDT

  • Check overpressure in MDT chamber when there is a stop-start of the system
  • Only one convertisseur, one pump, etc from the system —> Patrick/Kacper to fix
  • Found a problem of grounding on pressure sensors: pressure sensors changed. Now to verify if the grounding problem is still there
  • Problem in the 2 vaisala of humidifier: several spikes present. Not clear why. Before the software upgrade they were not present

RPC

  • Fill 3rd purifier
  • IR analyser to move in exhaust module: to schedule later when there will be PLC change

 

CMS

RPC

  • Michal changed the mother board in rack 67: now flow is 170 l/h (elog #2279) —> Andrea to check with new voegtlin red
  • Calibration of IR and GC for iC4H10 —> Mara
  • Change material of purifier 1 and 2 and fill 3rd (only when RPC will be in stop, probably September/October)

DT

  • Change one motherboard in rack 61 but flow didn’t change (elog #2280) —> to try to recalibrate one set of flowcells
  • Difficult to re-start the gas system after power-cut —> to do some tests
  • Test for power cut and re-start for the exhaust line —> to do other tests

GEM

  • Andrea prepared a drawing for ME0 and check for space in UX —> Andrea to send an email to Michele

CSC

  • On-going regulation of PID for the exhaust —> Beatrice
  • Warning to set-up —> Beatrice/Michal/Roberto

CF4 recovery

  • Install new storage battery —> Andrea
  • New MFC installation
  • To fix leaks in column B of CF4 absorber
  • Test new compressor
  • GC analysis of recuperated CF4

PGS

  • Check Freon supply > weight on side A/B (Mara)

GENERAL

  • Check of bande-chauffantes under floor and panel in

 

LHCb

 

MWPC

  • Problem in the GC analysis of the mixer: not visible the correct gas mixture with both LF and HF. Probably an hardware problem (connection, valve, etc) to find —> Mara
  • Leak in Mixer and Exhaust. Only in Exhaust found but not repaired. Other not yet founded —> Patrick

RICH2

  • To inject Air —> Patrick to check with C. Frei
  • To add line for analysis “supply to detector”

SciFi

  • Problem on 3-ways valve —> Patrick

PGS

  • Interlock of Ar/H2 does not work —> Michal/Patrick to check

 

GENERAL

 

  • Alarms/Errors in power supplies for all gas systems —> Patrick
  • Profibus check has to be done before and after the change of PLC —> Michal
  • Check of all Profibus connectors —> Patrick
  • Aging test of: black flowmeters Omron, LHCb CO2 IR, RPC new exhaust flowmeter, LHCb Coriolis

 

 

There are minutes attached to this event. Show them.
    • 1
      Final presentation
      Speaker: Sabino Zagaria (Universita & INFN Pisa (IT))
    • 2
      SMS alarms from gas systems
      Speaker: Mara Corbetta (Universite Claude Bernard Lyon I (FR))

      >> ATLAS warnings ?
      coming only from MDT, who is receiving them? Piquet? are they configured?

       

      link to weekly SMS alarms

      https://espace.cern.ch/gas-control/Shared%20Documents/Forms/AllItems.aspx?RootFolder=%2Fgas%2Dcontrol%2FShared%20Documents%2FActivities%2FSmsMail%20notification&FolderCTID=0x012000852472212F969B4E9850475116730F2C

      link to alarms summary

      https://espace.cern.ch/gas-control/_layouts/15/WopiFrame.aspx?sourcedoc=/gas-control/Shared%20Documents/Activities/SmsMail%20notification/Summary_Alarms.xlsx&action=default

      link to gas system checklists 

      https://espace.cern.ch/gas-control/_layouts/15/start.aspx#/Shared%20Documents/Activities/GasSystemsChecklist/

       

       

       

    • 3
      Reminder of activities to do at the re-start
      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Kacper Jerzy Kapusniak (CERN), Louis-Philippe De Menezes (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR)), Michal Zbigniew Zimny (CERN), Patrick Carrie (CERN), Roberto Guida (CERN), Sabino Zagaria (Universita & INFN Pisa (IT))

      ALICE

      CPV

      • We have 3 lines input that are ok, and 3 lines output: in one there is not the return. LPh contacted Yuri

      TPC

      • In the purifier the small thermic box triggered (also last year it happened) —> Patrick/LPh to check

      TRD

      • Recuperation: missing two valves but there are present in the software
      • Purifier: to review if keep the safety valve or the rupture disk
      • Purifier: safety valve at the input where we have Ar or Ar/H2 at high pressure —> LPh to check with safety

       

      ATLAS

      MDT

      • Check overpressure in MDT chamber when there is a stop-start of the system
      • Only one convertisseur, one pump, etc from the system —> Patrick/Kacper to fix
      • Found a problem of grounding on pressure sensors: pressure sensors changed. Now to verify if the grounding problem is still there
      • Problem in the 2 vaisala of humidifier: several spikes present. Not clear why. Before the software upgrade they were not present

      RPC (Fred)

      • Move the IR analyser inside the Exhaust module
      • Fill the 3rd purifier?

      CMS

      (Mara) Check bandes chauffantes under floor 
      (Mara) Check Freon Supply > weight on sideA/B 

      RPC

      • Michal changed the mother board in rack 67: now flow is 170 l/h (elog #2279) —> Andrea to check with new voegtlin red
      • (Mara) Isobutane 5% calibration for IR and GC
      • (Fred) Change product Purifier 1 & 2 and fill purifier 3?

      DT

      • Change one motherboard in rack 61 but flow didn’t change (elog #2280) —> to try to recalibrate one set of flowcells
      • Difficult to re-start the gas system after power-cut —> to do some tests
      • Test for power cut and re-start for the exhaust line —> to do other tests

      GEM

      • Andrea prepared a drawing for ME0 and check for space in UX —> Andrea to send an email to Michele

      CSC

      • On-going regulation of PID for the exhaust —> Beatrice
      • Warning to set-up —> Beatrice/Michal/Roberto
      • canbus cable to be replaced (elog #2320)

      CF4 Recovery (Mara)

      • MFCs Installation
      • Fix leaks column B CF4 adsorber
      • Install new storage battery
      • Test new compressor

       

      LHCb

       

      MWPC

      • Problem in the GC analysis of the mixer: not visible the correct gas mixture with both LF and HF. Probably an hardware problem (connection, valve, etc) to find —> Mara
      • Leak in Mixer and Exhaust. Only in Exhaust found but not repaired. Other not yet founded —> Patrick

      RICH2

      • To inject Air —> Patrick to check with C. Frei
      • To add line for analysis “supply to detector”k
      • (Mara) Ageing test of CO2 IR module 
      • (Mara) GC analysis of recuperated CF4 

      SciFi

      • Problem on 3-ways valve —> Patrick

      PGS

      • Interlock of Ar/H2 does not work —> Michal/Patrick to check 

       

      GENERAL

       

      • Alarms/Errors in power supplies for all gas systems —> Patrick
      • PROFIBUS check before and after the change of PLC —> Michal + somebody else
      • (Mara) Ageing test of black flowmeters Omron
    • 4
      M&O and project organization
      Speakers: Beatrice Mandelli (CERN), Roberto Guida (CERN)
    • 5
      Overview of planning LS2
      Speaker: Beatrice Mandelli (CERN)
    • 6
      Piquet interventions

      http://eloggas.cern.ch/GAS_PIQUET/

      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Kacper Jerzy Kapusniak (CERN), Michal Zbigniew Zimny (CERN)
    • 7
      Activities on-going
      Speakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN)
    • 8
      Plan of LS2 activities
      Speakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN), Roberto Guida (CERN)
    • Gas systems for the LHC experiments
      • 9
        ALICE
        Speaker: Louis-Philippe De Menezes (CERN)
      • 10
        ATLAS
        Speaker: Kacper Jerzy Kapusniak (CERN)
      • 11
        CMS
        Speaker: Andrea D'Auria (CERN)
      • 12
        LHCb
        Speaker: Patrick Carrie (CERN)
      • 13
        Gas analysis: standard H2O/O2
        Speaker: Louis-Philippe De Menezes (CERN)
      • 14
        Gas web-page

        http://test-gasmonitoring.web.cern.ch
        https://ep-dt-gasanalysis.web.cern.ch

        Speaker: Beatrice Mandelli (CERN)
      • 15
        Software
        Speaker: Michal Zbigniew Zimny (CERN)
    • Gas System developments
      • 16
        Gas System Test-Bench
        Speakers: Fabio Bordon (CERN), Sabino Zagaria (Universita & INFN Pisa (IT))
      • 17
        CMS CF4 recovery
        Speakers: Fabio Bordon (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 18
        LHCb RICH2 CF4 recuperation
        Speakers: Federico Consolaro (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 19
        R134a Recuperation
        Speakers: Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Ian Crotty (University of Wisconsin Madison (US)), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 20
        AoB
        Speakers: Fabio Bordon (CERN), Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Mara Corbetta (Universite Claude Bernard Lyon I (FR)), Sabino Zagaria (Universita & INFN Pisa (IT))
    • 21
      FSU & Jobs status
      Speaker: Frederic Merlet (CERN)
    • 22
      AoB
      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Roberto Guida (CERN)