Present: Hampus, James.
PS BGI
Installation schedule
- Magnet & tank installation at SS84 scheduled for 3rd June 2020, subject to RF tests of the tank. Action: Remove instrument from tank for RF test ( James & Josh. )
Mechanics
- Didier has updated the BGI-Vertical and BGI-Horizontal models with the new copper cold hold design and has also removed superfolous pieces (e.g. old detector design). Technical drawings prepared for new BGI-Horizontal pieces, meeting with Emilien tomorrow to kickstart production of the news parts need for two complete BGI-Horizontal instruments.
- Didier would have time to add the new Mk.III detector design to the CATIA model. Action: Send Mk.III designs (domino, ceramics, copper micro-bars) to Didier for incorporation in the CATIA model ( Swann when he returns. )
- Amorphous carbon coating still needs to be added to the Faraday cage cover. Action: Contact Wilhelmus Vollenberg ( James ).
Ionisation electron detector
- Timepix3 HPD's with selective metalisation have arrived from Advacam.
- As far as we know Hightec will deliver Ceramic PCB's at the beginning of June.
- Would be good to inform the electronics workshop & wirebonding lab that we will most likely need their services for two runs first in mid-June and (hopefully) a second run for the final modules some time later. Action: Communicate request to the electronics workshop & wirebonding lab ( Swann when he returns ).
- Status of the flex cables? Action for Swann when he returns.
Readout electronics
- Working on document to describe "PS BGI after LS2: Instrument Functions, Readout Architecture & User Interfaces."
- Hampus has done the schematics for the new SFP+ FMC mezzanine. Action: Contact Christos to setup a design review ( Hampus ).
- Annouce SFP+ FMC mezzanine & VPB update to the electronics worksop. Action: Contact William ( Hampus ) and ask Christos for the budget code ( James ).
SPS BGI
Preparation of instruments
- Need to test 1) new high voltage power supplies and 2) MCP / phosphor / camera ionisation electron detector. Action: Move HV PLC to 867 and setup instument (James & Josh ). Setup SILECS to provide HV control ( Hampus ).
Timepix3-BLM
New TImepix3-BLM PCB