GAS M&O meeting 29 June 2020

Present: Beatrice, Roberto, Patrick, Kacper, Fred, LPh, Gianluca, Fabio, Federico

Indico: https://indico.cern.ch/event/932267

 

ALICE #no elog

No discussion. Several items discussed the week before and status unknown.

 

ATLAS #2602

No checklist

MDT

  • P&ID test with Gianluca (elog #2576) to check results—> Kacper/Gianluca

From previous meeting:

  • Reset of pressure sensors giving problem (elog #2489)
    • To check the grounding

TGC

  • On-going activities to weld —> to prepare a plan of how many days are still needed

CSC

  • MFCs installed

RPC

  • Rack 65 in open mode: to check results —> Kacper/Gianluca
  • New mixer for BIS to finish this week —> Fabio
  • To prepare a list of things to do (mechanical+ electrical) when we will stop the system for the end of the week —> Kacper/Michal

From previous meeting:

  • to add test of all pressure sensors for dummy chambers in the elog —> Kacper
  • missing chassis to control the valves of new racks—> Patrick
  • 3rd purifier finished (water cooling): maintenance procedure to do

TRT

  • System will restart soon
  • MFCs installed
  • Maintenance when system will be off

From previous meeting:

  • Kacper to check for regeneration of purifier material
  • Maintenance to do

MM

  • construction mixer on-going
  • chassis ordered in May, so not yet delivered
  • not possible to put the software as planned

 

CMS #2589

Andrea on holidays. Below items that were planned for last week. To check with Andrea the status

No checklist

RPC

  • two flowcells in errors but difficult access in the rack (#3 in rack 85, #7 in rack 81) —> Michal/Andrea
  • to prepare a map of where the dummy chambers are installed —> Andrea/Aleksandar

From previous meetings

  • Still problem with iC4H10: set iC4H10 MFC at 4% to have 4.5% in IR
  • Increase ~ 250 l/h: we are working at very low range of MFCs (~10-20%) so error can be big. Three steps:
    • Increase the flow to ~600-800 l/h and perform GC analysis —> Andrea/Mara
    • Calculate benefit of having a R134 MFC with a max flow of 1000 l/h or having a not-ATEX MFC —> Beatrice
    • Check possibility of bring R134a and SF6 MFCs outside the rack —> Andrea

CSC

  • check pressure sensors of pre-distribution and distribution with Patrick’s calibrator —> Andrea/Mara

DT

  • HF MFC to install
    • GC analysis to do when we move to high flow —> Mara
  • to check with DT people when we can dismount LF MFC for calibration

PGS

  • It looks like there is something inverted in side A and B of SF6 (see attached picture in the elog) —> Michal to check

 

LHCb #2601

RICH1

  • In run in closed-loop —> Mara too check the status

RICH2

  • IR dismounted and given to Kostia, bronkhost pressure regulator added
  • Leak found in mixer between black panel and mixer
  • compressor module work started
  • New compressor module: found pump for the purifier gas recuperation but it is the last one. Nobody know if it passed the aging test —> aging test to foresee
  • Problems with Coriolis: work on-going—> Leonardo/Mara
  • To prepare the list of material still needed for the RICH2. Without list, no orders —> Fred/Patrick

MWPC

From previous meetings

  • GC analysis of correct MWPC gas mixture to check MFC —> Mara
  • to foresee leak search when CO2 analyser will work correctly

PGS

From previous meetings

  • Leak in He line —> Patrick to send an email to David

 

PIQUET

ALICE PGS SF6

ATLAS MDT

CMS RPC

  • no elog
  • warning on buffer pressure, probably due to a change of purfifier

 

 

GENERAL

  • LS2 planning
    • Planning updated with FSU used (available in DFS)
    • Usually we use a bit more FSU than foresee and in general we use more months than foresee
    • We have to try to stay in the dates foresee
  • Maintenance
    • Only Kacper filled the excel file —> all experiment responsible to fill asap
    • The procedures are here: dfs//Departments/PH/Groups/TA1/Gas_group/002_LS2/MaintenanceProcedures
    • Results have to be added here: dfs//Departments/PH/Groups/TA1/Gas_group/002_LS2/MaintenanceResults
    • New excel file to keep trace of what has been done for the maintenance —> to be filled by each experiment responsible
  • Aging test
    • LHCb CO2 IR,  David’s presser sensors, CF4 membrane, LHCb RI2 Coriolis, RI2 pump purif, RPC new exhaust flowmeter, black flowmeters Omron (ordered by priority)
  • ATEX pump
    • Small stock of pumps: no available anymore in the market. No small atex pumps found on the market —> Fabio to search for new ATEX pumps

 

From previous meeting:

  • Level of PGS sometimes is > 100% —> Michal to check

 

 

 

 

There are minutes attached to this event. Show them.
    • 09:00 → 09:10
      SMS alarms from gas systems 10m
      Speaker: Mara Corbetta (Universite Claude Bernard Lyon I (FR))
    • 09:10 → 09:20
      Reminder of activities to do at the re-start 10m
      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Kacper Jerzy Kapusniak (CERN), Louis-Philippe De Menezes (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR)), Michal Zbigniew Zimny (CERN), Patrick Carrie (CERN), Roberto Guida (CERN)
    • 09:20 → 09:30
      M&O and project organization 10m
      Speakers: Beatrice Mandelli (CERN), Roberto Guida (CERN)
    • 09:30 → 09:40
      Overview of planning LS2 10m
      Speaker: Beatrice Mandelli (CERN)
    • 09:40 → 09:45
      Piquet interventions 5m

      http://eloggas.cern.ch/GAS_PIQUET/

      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Kacper Jerzy Kapusniak (CERN), Michal Zbigniew Zimny (CERN)
    • 09:45 → 09:50
      Activities on-going 5m
      Speakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN)
    • 09:50 → 10:10
      Plan of LS2 activities 20m
      Speakers: Beatrice Mandelli (CERN), Frederic Merlet (CERN), Roberto Guida (CERN)
    • 10:10 → 11:35
      Gas systems for the LHC experiments
      • 10:25
        ALICE 5m
        Speaker: Louis-Philippe De Menezes (CERN)
      • 10:30
        ATLAS 5m
        Speaker: Kacper Jerzy Kapusniak (CERN)
      • 10:35
        CMS 5m
        Speaker: Andrea D'Auria (CERN)
      • 10:40
        LHCb 5m
        Speaker: Patrick Carrie (CERN)
      • 10:45
        Gas analysis: standard H2O/O2 5m
        Speaker: Louis-Philippe De Menezes (CERN)
      • 10:50
        Gas web-page 5m

        http://test-gasmonitoring.web.cern.ch
        https://ep-dt-gasanalysis.web.cern.ch

        Speaker: Beatrice Mandelli (CERN)
      • 10:55
        Software 10m
        Speaker: Michal Zbigniew Zimny (CERN)
    • 11:35 → 12:25
      Gas System developments
      • 11:35
        Gas System Test-Bench 10m
        Speaker: Fabio Bordon (CERN)
      • 11:45
        CMS CF4 recovery 10m
        Speakers: Fabio Bordon (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 11:55
        LHCb RICH2 CF4 recuperation 10m
        Speakers: Federico Consolaro (CERN), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 12:05
        R134a Recuperation 10m
        Speakers: Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Ian Crotty (University of Wisconsin Madison (US)), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
      • 12:15
        AoB 10m
        Speakers: Fabio Bordon (CERN), Federico Consolaro (CERN), Gianluca Rigoletti (Universite Claude Bernard Lyon I (FR)), Leonardo Nesti (Universita Di Bologna (IT)), Mara Corbetta (Universite Claude Bernard Lyon I (FR))
    • 12:25 → 12:35
      FSU & Jobs status 10m
      Speaker: Frederic Merlet (CERN)
    • 12:35 → 12:45
      AoB 10m
      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Frederic Merlet (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Roberto Guida (CERN)