XLS Integration
Action 1:
Does Quadrupole really include BPM and corrector?
Andrea to plan presentation from Ben Shephard, possibly next Thursday, July 9 or Friday, July 10 in the afternoon both days.
Action 2:
Markus to clarify the situation with vacuum pumps in the linac module (are wakefields monitors used to pump from the structures?)
Conclusion 1:
The linac modules and the lattice files are synchronized
Action 3:
Markus to put the Excel file on WP2 after cleanup
Action 4:
Nick can start to work on 3D drawings of the linac modules
Action 5:
Andrea and Avni to consolidate the BC designs
Action 6:
Alessandro will take contact with Ben Shepard
Action 7:
Alessandro will organize a meeting to discuss diagnostics and switchyards and bunch compressors. The presence of Simone or people who have experience with SwillFEL or LCSL is welcome.
Alessandro proposed:
Put an optical bunch length measurement after the BC2, and a TDC / Polarix after the linac 3 (in commissioning) / after the undulator (in operation)