Beam dump XPOC analysis

17 Jan 2007, 09:30
30m
874/1-011 (CERN)

874/1-011

CERN

Speaker

Brennan Goddard (CERN)

Description

Each dump action must be followed by an XPOC which is launched automatically and is designed to verify that the dump was correctly executed. If an anomaly is discovered during these tests, the XPOC must withhold the User Permit to the BIS (via a software channel). The XPOC comprises beam instrumentation and other signals which will come from the logging and Post- Mortem system, or direct from the equipment. The XPOC must be triggered by the dump action, must retrieve and analyse key data and make a comparison of the relevant parameters against specified reference values, and then give or withhold the User Permit according to the result. The requirements in terms of functionality, response times and scope are described, and the equipment subsystems identified. Data types, reduction, volumes and rates are estimated.