DESY test beam 2020 preparation
Minutes of the 2020 DESY Test Beam preparation meeting
In video on Tuesday, 7rth of July, 2020
Paul Colas, David Attié
News from DESY. The beam tests resumed on May 25, however with only German teams because of the closure of boarders. The schedule after the summer shutdown (last week of July) is now available.
The period reserved for us is from the 5th to the 16th of October as initially planned, and for this we have to install the detector mid-September during the last shutdown before the data taking period.
Mechanical support
The support system used in the June 2019 beam test will be re-used for supporting the field cage prototype in the magnet. The rotating support system (2 rings, the 4 spacer rods and the 8 brackets) is at Saclay and can be sent either to CERN or Legnaro mid-July, or directly to DESY (to be discussed). The possibility to make a mock-up of the system for use in Legnaro has been mentioned by Gianmaria.
Precise phi angle marks will be carved on the circular support.
External silicon tracker
Gianmaria prepared ‘bounding boxes’ and an estimate of the weight so that a support can be planned for and added to the 3D drawing. Mathieu and Gianmaria will attempt to synchronize the DAQ of the silicon tracker with the TPC.
Field cage (Padova/Legnaro)
The order for the second 1-module field cage prototype has been finally signed by INFN. The stripped kapton foil will be prepared on Friday July 10 or Monday 13. The new cage fabrication is planned to start at NEXUS in week 29 and should be delivered by end of July, probably in Legnaro (CERN will be hardly accessible until mid-September), for soldering resistors and mounting the HV connector (Orvim), and testing gas-tightness and HV behavior. (Note added in August : the fabrication could not start in July due to shortage of manpower at NEXUS).
Module frame
A module frame (model MFp1) will have to be mounted, probably in Legnaro. A second frame of the same model as the one presently mounted on the first prototype at CERN, which fits on the new design of the flange, should be machined by an IFJPAN subcontractor. Henry is waiting for the answer from
It might be that the transportation from Poland to CERN or Legnaro before mid-July is problematic. To be sure, a Module Frame will also be machined in Padova. The drawing and material specification has been sent to Gianmaria to this end.
The general assembly has been discussed. It is clear that the cage, the mounting frame and the detector should be put together in a clean room (hardly available at DESY), so the three parts probably have to arrive at CERN on time for this.
Cathode
The cathode is ready in Legnaro (a thick polished copper plate, spare from last year). The new vacuum connector from LEMO is available. Note that it has to fit the shape of the magnet angled and for this an ORVIM connector will be used in place.
Detector (Saclay)
The first ERAM Module (ERAM serial number 02) with a 200 µm layer insulation below the DLC-coated kapton is being tested in Saclay. Apparently due to the degradation of the protection during the long storage in poor conditions due to the Covid outbreak, it shows unstability needed to be cleaned 3 times. A repair with a drop of glue will be attempted.
A second ERAM PCB is available, and CERN will produce a spare ERAM module with exactly the same characteristics. There is a stiffener at Saclay. for the above-mentioned spare module.
GMC
Nick and Philip will move the Gas Monitoring Chamber presently at CERN to DESY in September, as it was in June 2019 with a bypass on the exhaust line. To make full use of the GMD data, the temperature and pressure has to be recorded (there is a measurement built-in in the gas system).
Philip will present final results of 2019 at the analysis meeting of Thursday 9th of July.
LV
Denis selected a low-voltage cable for the experiment at Tokai. David asked for a quote and received a sample from the Nexans company. The same or a similar cable (copper, 50 mm² section) is available for CERN. The references for these two are:
- Nexans : SIWOKUL B10 1x50 1.1kV (Section 50 mm², diameter 13.6 mm, …) : 1200€/100 m
- Cern : 04.08.61.950.9 (Section 50 mm² ; diameter 14.8 mm ; LSZH, résistant aux radiations) : 5 CHF/m, available on EDH
For the DESY test beam, 20 m of cable have been ordered by LPNHE at CERN, shipped to Saclay via the Saclay Antenne, and received in Saclay. It will be assembled (receive terminals and sense wire) end of July. The low-voltage supply is being shipped from LPNHE to Saclay where it will be used in the cosmic-ray test.
HV
SHV cables are in place in T24 area and a HV supply has to be brought there (to be tested mid-September the latest)
VHV
A cable is in place in T24 area and a 30 kV supply is available there.
FE electronics (LPNHE)
The electronic chain was tested with the cosmic-ray setup in Saclay and, despite small problems, it was judged satisfactory to allow the order of 84 boards, with a pre-production of 12, of which we expected to use 2 for the beam test setup. LPNHE has launched the production of the PCB (Wurst company) and the cabling by Ouestronic, and the first 12 cards should be ready end of July. The after ships for these first 12 cards were delivered.
Cooling (Saclay)
The Saclay prototype of carapace will be used with a chiller.
Backend
TRIGGER & DATA CONCENTRATOR MODULE: the only one available is now in use in the cosmic-ray test in Saclay.
DAQ
The MIDAS DAQ embedding Denis’s code should be used at DESY. It has been debugged by Joan and Denis. Access to the code on the cosmic setup DAQ computer at CERN was granted. It still need some cleaning and maybe further checks. It is now available from the Gitlab (https://git.t2k.org/hat-daq) setup by Mathieu Guigue. This Gitlab is accessible by the HAT-DAQ git group.
The currently used approach for the DAQ is based on the so-called "command server" developed by Denis which is running on TDCM (or its prototype based on an Enclustra board). The current implementation of the "command server" is running on Xilinx FPGA in a bear-metal mode (on just one CPU) and communicates with general DAQ via 'pclient' (custom version from Denis) or via MIDAS client (IFAE) running on a DAQ PC.
At LPNHE they intend to port (cross-compile) the "command server" code of Denis into embedded Linux running on Xilinx FPGA (2 CPUs are available) with a hope to gain in the data treatment and transfer speed due to high-performance Linux drivers. If successful, this approach could also allow cross-compilation of the MIDAS client as well. Diego takes care of this work.
It was decided to have a DAQ computer in the control room (the one which served in 2019 in DESY) and another computer (purchased by LPNHE) to do fast online analysis, with a fast connection to the first. A local network will be setup to ensure the connection between these two computers. Consequences of the sanitary regulations will have to be assessed: only 2 operators can sit simultaneously in the control room.
NEXT MEETING
The next discussion on the test beam preparation should probably be week 34. (Note added : this next meeting was finally scheduled on 31st of August)