WILL BE UPDATED DURING THE MEETING !!!
CoVid-19 Risk Assessment for the Facility : https://edms.cern.ch/document/2376286/1
General guideline :
Presence at GIF needs to be limited to minimum. If you can work from remote - please do.
If your IMPACT has not been resumed - please do not come to the GIF.
(for exceptions, please contact Giuseppe or Martin)
----------------------------------
Electronic locks now activated in the preparation area + service area !
(please subscribe to "GIF-ServiceArea" e-group)
----------------------------------
-Unexpected power-cut on Wednesday 22.07 (under investigation)
-Unexpected power-cut on Wednesday 29.07 (under investigation)
- again issues on the access system due to a loss of communication between the db of the access rights and our access system. - under investigation
----------------------------------
ATLAS-MM : Two new detectors in bunker now - for one week.
SM1 long term chamber inside bunker (2-3 months).
ATLAS - sTGC : One urgent chamber to be tested, otherwise a bit quieter.
CMS-CSC: (no report) Plan of restarting next week
EP-DT1: Setup moved in front of source. Will irradiate for 1 week.
Overnight with standard settings (Abs = 1). Short access at 17h and 08h.
Will stay in place until August.
EP-DT2 : Setup used. Running fine.
CMS-DT: Expected to return to bunker around September.
EcoGas : Currently stopped. Until ≈ next week
CMS-RPC : (no report) Radiation program resumed.
Trolley 147914 goes out next week.
ATLAS-RPC: Finished test, left bunker. Coming back end of September.
ATLAS-sMDT : Installation of gas pipes (small cable tray) first week of September (02.09)
New plan : upstream 2 meter.
==========================================================
Weekly Planning : https://teamup.com/ksvh7dak8mub8k7xpe
UPSTREAM : Default filter settings : 2.2
DOWNSTREAM : Default filter settings : 1
--------------------------------------------------------------------------------------------------
AUG test Prevessin : 24.09.2020 (TBC)
Upgrade WinCCOA of our dataserver: 02.09.2020 all morning
Current estimated NA beam start : 12/07/2021 (2.5 months delayed)
---------------------------------------------------------
Gas usage at GIF : we need to compile a table of gas mixture / consumption
Gas training courses : ATEX level 1 and F-Gas training courses.
List of trained people to be collected.
introduction, goal of the test, plan, needs
Bulgaria academy of science -> testing of new type of radiation monitor system
A new setup of ALICE-RPC will come. More news in coming weeks.
Lab on Fiber (LOF) dosimeter
Gas recuperation system to be installed - Responsible : Roberto
4 additional racks in Gas Service area. One containing flammable gas.
FG detection system to be installed, power needs to be provided.
(DELAYED by a few months. Will be first installed in CMS, and only later come to GIF)
Guidelines for filling in IMPACT requests
List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154
General Guideline : One IMPACT per setup.
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).
Improvements needed or planned for the facility.