HL-LHC BPM Design

Europe/Zurich
Dmitry Gudkov (Budker Institute of Nuclear Physics (RU)), Emilien Rigutto (CERN), Gerhard Schneider (CERN), Michal Krupa (CERN), Nicolas Sebastien Chritin (CERN)
  1. Springs fixation

    • Check with Feuerherdt about the different materials for the strips - action Dmitry

    • Nicolas showed a solution where a simple straight strip with extra milled faces on the cover

    • Design is nearly finished (the last question is above)

  1. Electrodes

    • The new design is integrated into the BPM 3D model

    • Karol's feedback - ok for manufacturing

    • To be discussed with Emilien on Monday

  2. Production readiness

    • Check with Hector if we can start manufacturing before PRR

    • Check with Hector what else we need for the PRR

  3. Documentation

    1. Released drawings are difficult to have by Monday, will proceed without released drawings

    2. BOM with empty cost estimate column - action Dmitry

    3. Keep electrodes is a separate project (R&D is not completed)

 

 

 

There are minutes attached to this event. Show them.
    • 15:30 15:40
      Absorbers Springs Design Update 10m
    • 15:40 16:05
      Design documentation for production meeting (next week) 25m
    • 16:05 16:15
      AOB 10m