Samuele Kaplun
November, 2010
Major work for OpenAIRE; major changes in workplan
----------------------------------------------------------------
WP2/T2.2: preparing the demo and demoed at the Concertation Meeting
WP4/T4.2: implementing multi-project deposition interface, enforcing document restriction (based on publication access rights)
WP6/T6.1: setting up Orphan final production machine
Major work for IT-UDS-CDS; major changes in workplan
----------------------------------------------------------------
Re-engineering the OAI-PMH handler, in order to improve speed and robustness (will be used a lot in OpenAIRE)
Major issues arising
--------------------
Plans to attend/organize major events
-------------------------------------------------------------
Major events attended (include links to event/presentation)
-----------------------------------------
Demoing OpenAIRE at the 8th e-Infrastructure Concertation Meeting on the 5th:
<http://indico.cern.ch/contributionDisplay.py?sessionId=9&contribId=35&confId=108791>
Holidays during the period
------------------------------------------------------------
0 days
TimeSheet for the month
------------------------------------------------------------
WP2: 10%
WP4: 60%
WP6: 30%