- Preben/Gerd: check PLC again; have modified if needed.
- Preben: check of filter; restart water; re-check of filter -> circuit clean.
- If problem with restarting -> Wolfgang to contact C. Rossi.
- Wolfgang to contact C. Rossi for presentation on dampers (PSB/PS).
- Safety corrections following electrical inspection and documents (Wolfgang).
- Splitter boxes (3 more to build; material for two being delivered; Reinier).
- Calibration: from equipment room to kick voltage and return (Preben).
- Preben to contact David for Interlocks (Temperarture/Flow)
- Naming transferred to future team.
- Two 800 W amplifiers given back to Salvatore (from the booster, gain much lower); PS: two amplifiers 800 W off, wait.
- Add Ferrite ring to spare transformer (Reinier).
- Clean-up in the tampon zone (Wolfgang).
- PPM transfer switch; 2nd crate (Gerd to ask Ylenia).
- leak in roof (ticket open).
- four 1 W amplifiers (Preben, check and cable).
- power/heat test; access needed (temperature).
Speaker:
Wolfgang Hofle
(CERN)