PS Damper work 15

Europe/Zurich
CERN

CERN

https://indico.cern.ch/event/924006/
    • 13:30 13:50
      Update on amplifier measurements 20m
      Speaker: Preben Sandve Solvang (CERN)
    • 14:20 14:30
      Update 10m
      • Preben/Gerd: check PLC again; have modified if needed.
      • Preben: check of filter; restart water; re-check of filter -> circuit clean.
      • If problem with restarting -> Wolfgang to contact C. Rossi.
      • Wolfgang to contact C. Rossi for presentation on dampers (PSB/PS).
      • Safety corrections following electrical inspection and documents (Wolfgang).
      • Splitter boxes (3 more to build; material for two being delivered; Reinier).
      • Calibration: from equipment room to kick voltage and return (Preben).
      • Preben to contact David for Interlocks (Temperarture/Flow)
      • Naming transferred to future team.
      • Two 800 W amplifiers given back to Salvatore (from the booster, gain much lower); PS: two amplifiers 800 W off, wait.
      • Add Ferrite ring to spare transformer (Reinier).
      • Clean-up in the tampon zone (Wolfgang).
      • PPM transfer switch; 2nd crate (Gerd to ask Ylenia).
      • leak in roof (ticket open).
      • four 1 W amplifiers (Preben, check and cable).
      • power/heat test; access needed (temperature).
      Speaker: Wolfgang Hofle (CERN)