Electron cooling

Operational experience of the LEIR e-cooler (A.Saa Hernandez, N.Biancacci)
July 2019
- Needs for LEIR and experience during beam cycles
- Upgrade plans for LS2 (G.Tranquille)

Operational experience of the AD/ELENA e-coolers (L.Poncet? D.Gamba? C.Carli?)
July/Aug 2019
- Needs for AD/ELENA and experience during beam cycles
- Upgrade plans for LS2 (G.Tranquille)

Follow up on AD cooler Consolidation Review
July 2019?
- Report on the review outcome (G.Tranquille)
- Any follow up
- Comparison between present and future AD cooler: gains in cycle and beam performance (G.Tranquille)
- Understanding of reason of present degraded cooling time (D.Gamba / A.Latina)
- Influence of AD optics on cooler performance (L.Poncet)

ELENA E-Cooler : status
September 2019?
- Report on commissioning 2019.
- Cooler performance
- Preparation to commissioning in 2020

Electron lenses

Optimisation of HEL collector (A.Rossi/D.Nikiforov)

Status of SixTrack implementation for Hollow Electron Lens (Alessio Mereghetti)

Other topics

  • Review on instrumentation for E-Lenses and E-Coolers, specifications, performace, usage during commissioning, tests and operations
    October 2019?
    --- E-Lenses : instrumentation @ RHIC, @ TEVATRON and @ HL-LHC
    --- E-Coolers instrumentation
  • E-Lens and E-Cooler Test Stands: characteristics and parameters, results and future plans (S.Sadovich, G.Tranquille/J.Cenede)
This category is empty.