HI-ECN3 WP2: Beam Instrumentation in TCC8 before BDF #2

Europe/Zurich
865/1-D17 (CERN)

865/1-D17

CERN

25
Show room on map
    • 15:00 15:10
      Round table 10m

      Actions:
      - Update TIDVG position in the model (Alex)
      - Update BLM positions on EDMS (Alex, Christos)

      Speakers: Aleksandr Gorn, Fabian Metzger (CERN), Laurie Nevay (CERN), Matthew Alexander Fraser (CERN)
    • 15:10 15:20
      Muon Background Studies 10m
      Speaker: Florian Wolfgang Stummer
    • 15:20 15:30
      User Requirements for Diagnostics - Document Status 10m

      @Mike: The BDF target will be damaged if the energy density deposited by the beam is not diluted [add REF]

      @Claudia: How long for access to TCC8 (upstream of the target) to exchange a BI device? Can it be done in one day?

      @Florian: Need a statement on experimental background concerns from BI

      @Fabrian: Table 1: for commissioning we need to check lowest intensity for the performance of the monitor (signal and beam size). We need to discuss what we do for the V beam size at low intensity: do we blow-up the V emittance or change the emittance so as not to stress the requirement on wire spacing.

      Speaker: Matthew Alexander Fraser (CERN)
    • 15:30 16:00
      First Proposal of a Possible Beam Instrumentation System + Discussion 30m

      Integration with SHiP DAQ needs discussing and specifying for Fast Spill Monitor and Beam Dilution Monitor : Federico ALESSIO is our contact person

      Speaker: David Belohrad (CERN)