The LHC Injectors Upgrade (LIU) should plan for delivering reliably to the LHC the beams required for reaching the goals of the high luminosity LHC (HL-LHC). This includes LINAC4, the PS Booster, the PS, the SPS, as well as the heavy ion chain.
Within the LIU project the PS Booster upgrade project (“LIU-PSB”) coordinates all activities related to an upgrade of the PS Booster in order to deliver ultimate LHC beams. This had included the study of two scenarios to replace the PS Booster by a new PS injector : PSB Energy Upgrade and Rapid Cycling Synchroton (RCS). In August 2011, it was decided not to go further in the RCS study (a link to the study remain here), and to go for the PSB Energy Upgrade.

The meeting was then closed end 2018 and the charge was taken care by the LIU-PSB Technical Coordination Meeting

Categories in PSB Energy Upgrade WG Meeting