7–9 Dec 2010
Hilton, Evian
Europe/Zurich timezone

Bunch by bunch beam instrumentation

8 Dec 2010, 11:00
30m
Hilton, Evian

Hilton, Evian

Speaker

T. Lefevre

Description

This talk describes the LHC bunch by bunch beam instrumentation. The status of all the different systems are reviewed: Wire scanner, Synchrotron light monitor, Beam Position monitor, Schottky monitor, BCT, Wall current monitor, Longitudinal density monitors and Luminosity monitors. The achieved performances in 2010 and the already known limitations of both the hardware and the software will be discussed. The plans for upgrades in 2011 will finally be presented.

Presentation materials