Speaker
Bruno Vullierme
(CERN)
Description
Operating temperature options, crab specific cryogenics at IR1, IR5, IR4, SPS & SM18, Helium pressure and availability, cryo circuits and controls, safety valves and protection, overall installation effort,cost and time line, heat loads, impact on the overall LHC during regular operation
Author
Bruno Vullierme
(CERN)