15–17 Dec 2010
CERN
Europe/Zurich timezone

ODU/JLab cavity development

15 Dec 2010, 15:10
15m
6/2-024 - BE Auditorium Meyrin (CERN)

6/2-024 - BE Auditorium Meyrin

CERN

114
Show room on map

Speaker

Jean Delayen (Thomas Jefferson National Accelerator Facility)

Description

The development of the parallel bar cavity at 400 MHz toward a crab cavity for the LHC. Detailed cavity-coupler design including deflecting mode characteristics, HOM spectra and achievable damping, coupler configurations, mechanical tolerances, tuning concepts, multipacting and non-linearity of deflecting voltage with transverse offset. Additionally cavity fabrication, treatment, assembly of coupler, Helium vessel and ancillary equipment should be foreseen within the design concept.

Author

Jean Delayen (Thomas Jefferson National Accelerator Facility)

Presentation materials