15–17 Dec 2010
CERN
Europe/Zurich timezone

Session

LHC-CC status & review

15 Dec 2010, 08:30
6/2-024 - BE Auditorium Meyrin (CERN)

6/2-024 - BE Auditorium Meyrin

CERN

114
Show room on map

Presentation materials

There are no materials yet.

  1. Steve Myers (CERN)
    15/12/2010, 08:30
  2. Yoshihiro Funakoshi (KEK)
    15/12/2010, 08:40
    The implementation of large angle crab crossing using superconducting cavities operating on the TM110 mode. Beam commissioning, operation, cavity availability, reliability and luminosity increase from the crab crossing (purely geometric gain plus gain in beam-beam tune shift). KEKB crab-cavity diagnostics and set-up/tuning/alignment procedures. Frequency, reasons, beam observations, and...
    Go to contribution page
  3. Oliver Bruning (CERN)
    15/12/2010, 09:00
    LHC beams and luminosity evolution during the 2010 Run with some estimates on future projections. Present intensity limitations from operational experience and machine availability. Hints on upgrade beam parameters based on LHC experience (for example, lower emittance and higher than nominal beam-beam tune shift)
    Go to contribution page
  4. Dr Jordan Nash (Imperial College)
    15/12/2010, 09:20
    Detector upgrade plans and schedule for the experiments, and their alignment with planned LHC upgrade. Constraints and requirements from the experiments on the proposed upgrade scenarios with crab cavities, early separation with D0 dipole, and large Piwinski angle scheme. Planned civil engineering and upgrade work around IP's 1 and 5 that could have synergies or conflicts with a crab-cavity...
    Go to contribution page
  5. Prof. Lucio Rossi (CERN)
    15/12/2010, 09:40
    The motivation of the high luminosity LHC design study, goal, scope, required technologies, time line, technology choices and decision dates, overall cost estimate and resources. The collaborative framework of this design study with EuCARD, US and Japanese partners. R&D plan for the novel technologies, in particular for the crab cavities required to realize the full potential of the LHC...
    Go to contribution page
  6. 15/12/2010, 10:00
Building timetable...