Participants: E. Adli, A. Aksoy, J. Barranco, B. Dalena, K. Elsener, B. Jeanneret, Ö. Mete, S. Ozkorucuklu, J. Pfingstner, L. Rinolfi, D. Schulte, H. Shaker, P. Skowronski, J. Snuverink, G. Sterbini, F. Stulle, R. Tomas
D.S. informed that the CLIC home page will be updated soon. A page about beam physics will have to be created. The timetable for the plenary talks at the CLIC ILC workshop is finished. The working group conveeners will soon start to compile timetable for the working groups.
B.J. showed latest changes for the drive beam layout. DBA1 and gun will be folded over to fit on the site.
A.A. presented optimization results for the drive beam linac and first bunch compressor. A standard chicane with a moderate R56 around -0.1m was found to be a good option.
There are minutes attached to this event.