24–28 Jan 2011
Chamonix
Europe/Zurich timezone

EL Activities during 2012 Long Shutdown

25 Jan 2011, 10:55
15m
Chamonix

Chamonix

Speaker

Francois Duval

Description

EN/EL will be leading 3 main LHC projects: - R2E (relocation of EL equipment in LHC points 1, 5, 7 and 8) - Water cooled cables to be replaced in 3 LHC points - UPS (APC SILCON) to be replaced (circa 80 units) EN/EL will be involved in many others. Only a few of them are known today. (Vacuum pump cabling, RF cables replacement, QPS cabling …..) Several non LHC projects but directly connected to LHC runs will required a major contribution from EN/EL. Computer center, B513 upgrade and CCC upgrade will be the main ones. Several EL Consolidation works on the power distribution network are more or less affecting LHC operations: - Prevessin distribution substation & 3.3kV safety network - Upgrade/consolidation of 66kV substation protection system - Upgrade of SW (ME59) substation (including 66/18kV trafo) - 400kV maintenance on both CERN & RTE sides And many other tasks, not connected to LHC operations, will sharply increase the EL turnover for the shutdown.. Postponing the long shutdown from 2012 to 2013 will mainly: - increase the risk on SPS irradiated cables (no replacement since 2008/2009 campaign) - Induce schedule changes on CC, B513 upgrade project - Postpone for the 3rd time RTE maintenance on Bois-Tollot substation and Genissiat power line

Presentation materials