Dr
Simone Gilardoni
(CERN)
24/09/2010, 09:15
• Performance and reasons to stop normal operation with MTE
• Issues encountered (controls, instrumentation, kickers)
• Next steps
• Requirements for completing the commissioning in 2010 (instrumentation, controls, OP support, time required in dedicated mode)
• Optics of the extraction line
• Impact of MTE-related studies on other operational beams
Dr
Massimo Giovannozzi
(CERN)
24/09/2010, 09:55
• Stability issues
• Required tools and instrumentation
Rende Steerenberg
(CERN)
24/09/2010, 10:50
• Status of setting up after the first operational period
• Things to be re-done
• Status of the transfer line
• Requirements for operation of Fixed-Target/CNGS with MTE
Karel Cornelis
(CERN)
24/09/2010, 11:30
• Status of setting up after the first operational period
• Things to be re-done
• Status of the transfer line
• Requirements for operation of Fixed-Target/CNGS with MTE
Markus Widorski
(CERN)
24/09/2010, 12:10
• Status of ring (septum excluded) after MTE operation
• Septum activation
• TT10 hot spot
• Linac 3 area
• CT vs. MTE in terms of losses
• Requirements for running with MTE
• Long term requirements in case of MTE running: shielding on top of SMH16, barracks in the ring center
Pierre Freyermuth
(CERN)
24/09/2010, 14:15
• Check with new observation tools: PFWs, F8L, low-energy quads, sextupoles and octupoles
• B-field fluctuations
Mr
Jean-Jacques GRAS
(CERN AB-BDI)
24/09/2010, 14:55
• Status of beam current transformers
• TT2 couplers: what is needed to make them operational
• Status of new wire scanners
• Status of LHC BLMs: actual and expected performance