EMI SA2 Weekly Meeting

→ Europe/Zurich
CERN

CERN

Description
Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=e8eteDvBvDataDa9I8
- Phone Bridge
ID: 62440
- Phone Bridges Numbers
http://evo.caltech.edu/evoGate/telephone.jsp

NOTE: THE MEETING IS RECORDED (for minutes-taking only purposes, then the files are deleted)
 
Action List
Minutes
    • 10:30 → 10:40
      Action List Review 10m
      Emi Sa2 Action List
    • 10:40 → 11:10
      Task Reports and Progress 30m
      In this first meeting we will discuss on who is working on which task(s).
      • TSA2.1 – Work Package coordination 5m
        + Status and Progress - PEB: preparation of the AHM meetings. - SA1 KPIs status.SA1 says that some of their KPIs are from our metrics (discuss with Mathilde and Giuseppe). - Release mgmt will be discussed. Do some guidelines need to be updated? - REGISTER HERE: http://indico.cern.ch/conferenceDisplay.py?confId=108375 - No SA2 Side meetings we will try to fit in the slot we have: - Preparation of the AHM, will have during the SA2 session: Presentations at AHM - overview (A. Aimar) Discussions (prepare a couple of slides?) - tools (L. Dini) - guidelines (M. Alandes) - metrics (E. Kenny) - testbeds (D. Dongiovanni cannot participate, Jozef will do it) - Preparing the SA2 Quarterly Report for the EU. - GGUS for Testbeds and tools: "EMI Testbeds" and "EMI QA Tools". Available and is it working? - PEB asked for when on the Testbeds there will be installed the Production and RCs version of all products. For general usage by the PTs. - Asked for review of Testbeds deliverable (ended up to Gianni?) and of Quarterly Report
        SA2 Internal Wiki
        Sa2 Meetings
      • TSA2.2 – Quality Assurance Process Definition and Monitoring 5m
        + Status and Progress - Review Compute Area work plan - Review Security Area work plan - Prepare presentation about SA2.2 progress for AHM (first version sent to Alberto) - Release guidelines - Discussed with Owen about Change Management Guidelines and updated bug status diagram (syntax improved, nothing else has changed) + Issues to Discuss - The release guidelines should help to trigger the Release plan deliverable. + Steps Next Week - Attend AHM.
      • TSA2.3 – Metrics and KPIs Definition and Reporting 5m
        + Status and Progress - Draft of SA2.3 slides for AHM sent to Alberto. - GGUS meeting regarding user incident metrics (2 of 4) already calculable. - Liaising with SA2.4 constantly on metric plots. Very good plots so far. - Long to and fro about validity and catch-all for PriorityBugs metric. There needs to be an OpenPriorityBugs metric in addition to the closed existing PriorityBugs metric to clearly show the progress per allotted time period (e.g: per quarter). - Metrics report v0.31 include PriorityBugs and OpenPriorityBugs (new). - optional notverified state added to bug categories, to allow for certified but not verified. + Issues to Discuss - Discussions with dCache (Owen Synge) about most important RfC states (open, fixed, verified, closed)? + Steps Next Week - Awaiting Bug-listings from dCache/ARC. - Awaiting better GGUS support for remaining user incident metrics. - Assess whether there is a place for median/quartile ranges as well as averages in metric plots. - Attend AHM.
      • TSA2.4 – Tools and Repositories Selection, Maintenance and Integration 5m
        + Status and Progress - Packaging guidelines completed (for now) - ETICS 3.2 release - EMI external registration and integration support - registration script changed to add "package.prefix" - Repository client fix to support OS.DEFAULT - Release foreseen today - ETICS infrastructure support - EPEL WNs are now 3 - WN rebooting because of kernel bug (negative uptime) - OpenSSL seed problem fix - 3rd part - afs_check_server kills WN - new externals added to the EPEL platform - Metrics Report generator - first graphs available - Shown at the AHM - Plugins work ongoing + Issues to Discuss + Steps Next Week - Deliverable - Release new client with OS.DEFAULT
      • TSA2.5 – QA Implementation Review and Support 5m
        + Status and Progress 2.6 -we restored operation of testbed -preparation on lecture at all hands meeting 2.5 -preparation of feedback to reviewed deliverables (deadline 19.11) -local discussion about a design of the functional test tool + Issues to Discuss + Steps Next Week lecture on testbed at all hands meeting feedback for deliverable (deadline 21.11)
      • TSA2.6 – Testbeds Setup, Maintenance and Coordination 5m
        + Status and Progress From Danilo: - deliverable DS24: received review from O.Keeble sa1. I updated and uploaded the new document. + sent him a document with reply to questions which are beyond the scope of deliverable to me. Waiting for him to reply. We should know before friday. - broadcast mail about Testbed sent to SA2 - prepared presentation for Testbed and sent to Jozef and Alberto for revision - Arc resources available again. - CERN: new nagios instance available, new (upgraded) DPM SE available + Issues to Discuss + Steps Next Week - continue with on-going tasks - broadcast mail about Testbed in place
    • 11:10 → 11:30
      Issue and Topics to Discuss 20m
      • AOB