ERAM Meeting
-
-
11:00
→
11:45
ERAM status
-
11:00
ERAM production status at Rui's lab 5mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN)
- 11:05
- 11:15
-
11:20
ERAM testing 10mSpeakers: Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
Last 2 weeks:
1-MM1-DLC2
Problem: no filter present in the ERAM Module
We didn't received the parcel from Saclay with the external filter
Tentative to add a filter with Katharina and Thorsten...
This MM1-DLC2 needs to be rescanned after soldeing a right filter
2- ERAM-13
Scanned launched on Friday morning - we add some trouble (one connector not fully screwed) when flushing with Argon.
________________________________________________________________________________________________
Connection of an argon line (single bottle next to the test bench) with a valve (2 inlets / 1 output)
Flushing ERAM_20 with Argon gaz for 1 day,
Then switching to T2K Gas (rack of 12 bottles)
_____________________________________________
List of ERAM to be scanned
20 to be pulse meshed again
26 (second round)
redo 23 because we have two half scans: Planned to be prepared tuesday 23.08.2022
https://cernbox.cern.ch/index.php/apps/files/?dir=/__myprojects/t2k-eram/Docs&#office
- MM1-DLC2 (bien vérifier avant qu’il est bien vivant, 300 V sous le flux laminaire- ERAM-13- ERAM-23- ERAM-01- ERAM-03Module scan date (french) cards (L/R) commentaire priority order for scans ERAM-01 04/03/2022 81/33 (Keep these cards do the scan again because very first old scan ? Same cards 6 5 ERAM-03 being scanned new cards (22/55 from ERAM-17 ?) damaged by sparks. Do the scan anyway (to see damaged effect on gain/resol) 7 ERAM-13 18/05/2022 56/81 --> New cards same cards as 1 & 2! To be done again with new set of cards 2 1 ERAM-20 to be glued and scanned new cards 3 ERAM-23 20/04/2022 70/63 can in 2 halves, to be done again with same cards, to be removed from mock-up first 4 the last 400 kOhm one
11.
redo 13 because we are not sure we are using the right cards
redo 17
-
11:30
ERAM AOB 15mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR))
Stock of Stiffners/ FEC Cards / FEM Cards @ cern : => Stock-Stiffners-Available - Files - CERNBox: the CERN Cloud Storage
Stiffner Statusi: #15 Stiffners (+2 not sanded)
CAISSE Stiffner # Comments A 18 cleaned @Ruis'Lab 27 cleaned @Ruis'Lab 6 cleaned @Ruis'Lab 3 cleaned @Ruis'Lab 17 cleaned @Ruis'Lab B 42 cleaned @Ruis'Lab 41 cleaned @Ruis'Lab 44 cleaned @Ruis'Lab 43 cleaned @Ruis'Lab 46 cleaned @Ruis'Lab 45 cleaned @Ruis'Lab 47 cleaned @Ruis'Lab 48 cleaned @Ruis'Lab 5 not sanded yet 25 not sanded yet TOTAL STIFFNERS @CERN 15 (2 not sanded yet) FEC Cards Status (#7 pairs of FEC cards)
FEC #LEFT #RIGHT Location Comments 58 51 box 1/2 79 67 box 1/2 84 80 box 1/2 (fund into blue cabinet) 2 9 box 2/2 8 31 box 2/2 10 7 box 2/2 30 4 box 2/2 TOTAL STIFFNERS @CERN 7 Pair(s) of new FEC Cards ready to be used: FEM Cards Status: #7 cards
FEM # Comments FEM S01 en stock armoire bleue 182 1,00 FEM S18 en stock armoire bleue 182 1,00 FEM P04 en stock armoire bleue 182 1,00 FEM S03 en stock armoire bleue 182 1,00 FEM S34 en stock armoire bleue 182 1,00 FEM S32 en stock armoire bleue 182 1,00 FEM S37 en stock armoire bleue 182 FEM S007 en stock armoire bleue 182 1,00 FEM S13 en stock armoire bleue 182 FEM S28 en stock armoire bleue 182 Stock Carte FEM = 7,00 Rack de 6 bouteilles livré le 15.07.2022 - (il reste une bouteille pleine pour les tests XRay)
premier lot de 6 fin juillet: commande OK, rack reçu
second lot début août: commande OK, rack reçu
Stock actuel au 19.09.2022:
- 10 bouteilles pleines (individuelles)
- Lot de 12 bouteilles supplémentaires (connectées ensemble) reçues la semaine dernière pour le banc de test 'Full scan'
- Stock FEC Cards: from Lpnhe on the way, will be delivered at CERN at 182
- Stock FEM Cards: #10
- Camera 360: en cours d'installation (test de connexion au réseau cern à poursuivre): Fonctionne localement via un téléphone mobile, quelques difficultée pour le faire reconnaitre sur le réseau cern
-
11:00
-
11:00
→
11:45