ERAM status
-
11:00
ERAM production status at Rui's lab 5mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN)
- ERAM_29 foil - resistivity measured on the corner (on corner with 'wrong' value...) - file available will check this week
- asked to get all resistivity measurements since the beginning of the year (since ERAM 17)
- Still waiting for restart of production
- Received resistivity measurements for the two new batches of foils (batch 7 and 8) and one of them (batch 8) is too high (we asked for 1 MOhm and measured 1.5 MOhm)
- Even after baking, the resistivity is too high (700 kOhm)
- Meeting today with Rui to discuss these measurements, discuss about possible change of glue thickness
- e.g. if we choose to use higher resistivity foils we might need to increase glue thickness to preserve RC
- Saclay meeting on Wednesday dedicated to decision on whether to give green light on start of production
- Reminder - one foil is up to 14 ERAMs but need to take into account the quality of the DLC
Last week
- ERAM_14 foil (old PCB) and ERAM_30 (new PCB) sent to Rui's Lab to do resistivity measures
- set of 8 Stiffners Cleaned
- New Foils: Resistivity measured: Selection to be confirmed in order to start the production...
- ERAM_29 foil - resistivity measured on the corner (on corner with 'wrong' value...) - file available will check this week
- 11:05
- 11:15
-
11:20
ERAM testing 10mSpeakers: Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
Cyrille and Katharina found a lot of dust inside the frame, and cleaned everything thoroughly
Also surface of detector cleaned. But most of the dust was from the frame itself (in the corners especially). Not so much dust on the detector itself.
Reason for dust is probably from MM1-DLC2 (which was quite dirty)
For the future, it's important to clean the chamber from time to time
Change to test bench:
Changed the channel for the power supply - now the anode is on CH3 (00.002) - to be updated in procedure.
MM1-DLC2 is still not equipped with HV filter so we cannot measure it this week, but Alain et al coming to CERN next week with the filter.
ERAM 13 scan looks fine.
This week:
David will check with Samira if we should do a high stats run this week on already installed ERAM 13. Otherwise skip shift this week.
ERAMs to be scanned
- ERAM23 - in Mock-up
- ERAM01 - in Mock-up
- MM1-DLC2 - waiting for HV filter
Last 3 weeks:
1-MM1-DLC2
Problem: no filter present in the ERAM Module
We didn't received the parcel from Saclay with the external filter
Tentative to add a filter with Katharina and Thorsten...
This MM1-DLC2 needs to be rescanned after soldeing a right filter
2- ERAM-13
Scanned launched on Friday morning - we add some trouble (one connector not fully screwed) when flushing with Argon.
3- ERAM-13
We add again some trouble regarding dust inside the frame. (several trips)
We dismounted the frame and cleaned it carefully both the frame and the detector (using also the very sticky roller), then set-up again the same detector.
Scanned launched on Thursday afternoon - 10.11.2022
Scanned successfull.
https://cernbox.cern.ch/files/spaces/eos/project/t/t2k-eram/ERAM_PROD/ERAM-13?items-per-page=100
-
11:30
ERAM AOB 15mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR))
Stock of Stiffners/ FEC Cards / FEM Cards @ cern : => Stock-Stiffners-Available - Files - CERNBox: the CERN Cloud Storage
Stiffner Statusi: #15 Stiffners (+2 not sanded)
CAISSE Stiffner # Comments A 18 cleaned @Ruis'Lab 27 cleaned @Ruis'Lab 6 cleaned @Ruis'Lab 3 cleaned @Ruis'Lab 17 cleaned @Ruis'Lab B 42 cleaned @Ruis'Lab 41 cleaned @Ruis'Lab 44 cleaned @Ruis'Lab 43 cleaned @Ruis'Lab 46 cleaned @Ruis'Lab 45 cleaned @Ruis'Lab 47 cleaned @Ruis'Lab 48 cleaned @Ruis'Lab 5 not sanded yet 25 not sanded yet TOTAL STIFFNERS @CERN 15 (2 not sanded yet) FEC Cards Status (#7 pairs of FEC cards)
FEC #LEFT #RIGHT Location Comments 58 51 box 1/2 79 67 box 1/2 84 80 box 1/2 (fund into blue cabinet) 2 9 box 2/2 8 31 box 2/2 10 7 box 2/2 30 4 box 2/2 TOTAL STIFFNERS @CERN 7 Pair(s) of new FEC Cards ready to be used: FEM Cards Status: #7 cards
FEM # Comments FEM S01 en stock armoire bleue 182 1,00 FEM S18 en stock armoire bleue 182 1,00 FEM P04 en stock armoire bleue 182 1,00 FEM S03 en stock armoire bleue 182 1,00 FEM S34 en stock armoire bleue 182 1,00 FEM S32 en stock armoire bleue 182 1,00 FEM S37 en stock armoire bleue 182 FEM S007 en stock armoire bleue 182 1,00 FEM S13 en stock armoire bleue 182 FEM S28 en stock armoire bleue 182 Stock Carte FEM = 7,00 Rack de 6 bouteilles livré le 15.07.2022 - (il reste une bouteille pleine pour les tests XRay)
premier lot de 6 fin juillet: commande OK, rack reçu
second lot début août: commande OK, rack reçu
Stock actuel au 19.09.2022:
- 10 bouteilles pleines (individuelles)
- Lot de 12 bouteilles supplémentaires (connectées ensemble) reçues la semaine dernière pour le banc de test 'Full scan'
- Stock FEC Cards: from Lpnhe on the way, will be delivered at CERN at 182
- Stock FEM Cards: #10
- Camera 360: en cours d'installation (test de connexion au réseau cern à poursuivre): Fonctionne localement via un téléphone mobile, quelques difficultée pour le faire reconnaitre sur le réseau cern
-