ERAM Meeting

→ Europe/Zurich
Alain Delbart (Université Paris-Saclay (FR))
    • 11:00 → 11:45
      ERAM status
      • 11:00
        ERAM production status at Rui's lab 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN)
        • ERAM_29 foil - resistivity measured on the corner (on corner with 'wrong' value...) - file available will check this week
          • asked to get all resistivity measurements since the beginning of the year (since ERAM 17)
        • Still waiting for restart of production
          • Received resistivity measurements for the two new batches of foils (batch 7 and 8) and one of them (batch 8) is too high (we asked for 1 MOhm and measured 1.5 MOhm)
          • Even after baking, the resistivity is too high (700 kOhm)
          • Meeting today with Rui to discuss these measurements, discuss about possible change of glue thickness
            • e.g. if we choose to use higher resistivity foils we might need to increase glue thickness to preserve RC
        • Saclay meeting on Wednesday dedicated to decision on whether to give green light on start of production
        • Reminder - one foil is up to 14 ERAMs but need to take into account the quality of the DLC

         


        Last week

        • ERAM_14 foil (old PCB) and ERAM_30 (new PCB) sent to Rui's Lab to do resistivity measures
        • set of 8 Stiffners Cleaned
        • New Foils: Resistivity measured: Selection to be confirmed in order to start the production...
      • 11:05
        Mesh pulsing 10m
        Speakers: Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

         

         

        No more pulse mesh last week

      • 11:15
        ERAM gluing 5m
        Speakers: Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR))

         

        no more gluing last week

      • 11:20
        ERAM testing 10m
        Speakers: Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

        Cyrille and Katharina found a lot of dust inside the frame, and cleaned everything thoroughly

        Also surface of detector cleaned. But most of the dust was from the frame itself (in the corners especially). Not so much dust on the detector itself.

        Reason for dust is probably from MM1-DLC2 (which was quite dirty)

        For the future, it's important to clean the chamber from time to time

        Change to test bench:

        Changed the channel for the power supply - now the anode is on CH3 (00.002) - to be updated in procedure.

        MM1-DLC2 is still not equipped with HV filter so we cannot measure it this week, but Alain et al coming to CERN next week with the filter. 

        ERAM 13 scan looks fine.

         

        This week:

        David will check with Samira if we should do a high stats run this week on already installed ERAM 13. Otherwise skip shift this week. 

        ERAMs to be scanned

        • ERAM23 - in Mock-up
        • ERAM01 - in Mock-up
        • MM1-DLC2 - waiting for HV filter

        Last 3 weeks: 

        1-MM1-DLC2

        Problem: no filter present in the ERAM Module

        We didn't received the parcel from Saclay with the external filter

        Tentative to add a filter with Katharina and Thorsten...

        This MM1-DLC2 needs to be rescanned after soldeing a right filter

         

        2- ERAM-13

        Scanned launched on Friday morning - we add some trouble (one connector not fully screwed) when flushing with Argon.

         

        3- ERAM-13

        We add again some trouble regarding dust inside the frame. (several trips)

        We dismounted the frame and cleaned it carefully both the frame and the detector (using also the very sticky roller), then set-up again the same detector.

        Scanned launched on Thursday afternoon - 10.11.2022

        Scanned successfull. 

        https://cernbox.cern.ch/files/spaces/eos/project/t/t2k-eram/ERAM_PROD/ERAM-13?items-per-page=100

      • 11:30
        ERAM AOB 15m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR))

        Stock of Stiffners/ FEC Cards / FEM Cards @ cern : => Stock-Stiffners-Available - Files - CERNBox: the CERN Cloud Storage

         

        Stiffner Statusi: #15 Stiffners (+2 not sanded)

         

        CAISSEStiffner #Comments
        A18cleaned @Ruis'Lab
         27cleaned @Ruis'Lab
         6cleaned @Ruis'Lab
         3cleaned @Ruis'Lab
         17cleaned @Ruis'Lab
        B42cleaned @Ruis'Lab
         41cleaned @Ruis'Lab
         44cleaned @Ruis'Lab
         43cleaned @Ruis'Lab
         46cleaned @Ruis'Lab
         45cleaned @Ruis'Lab
         47cleaned @Ruis'Lab
         48cleaned @Ruis'Lab
         5not sanded yet
         25not sanded yet
           
        TOTAL STIFFNERS @CERN15(2 not sanded yet)

        FEC Cards Status (#7 pairs of FEC cards)

         

        FEC#LEFT#RIGHTLocationComments
         5851box 1/2 
         7967box 1/2 
         8480box 1/2(fund into blue cabinet)
         29box 2/2 
         831box 2/2 
         107box 2/2 
         304box 2/2 
             
             
             
        TOTAL STIFFNERS @CERN7Pair(s) of new FEC Cards ready to be used:  

         

        FEM Cards Status: #7 cards

         

        FEM#Comments   
        FEMS01en stock armoire bleue 1821,00  
        FEMS18en stock armoire bleue 1821,00  
        FEMP04en stock armoire bleue 1821,00  
        FEMS03en stock armoire bleue 1821,00  
        FEMS34en stock armoire bleue 1821,00  
        FEMS32en stock armoire bleue 1821,00  
        FEMS37en stock armoire bleue 182   
        FEMS007en stock armoire bleue 1821,00  
        FEMS13en stock armoire bleue 182   
        FEMS28en stock armoire bleue 182   
              
              
            Stock Carte FEM = 7,00

         

        Rack de 6 bouteilles livré le 15.07.2022 - (il reste une bouteille pleine pour les tests XRay)

        premier lot de 6 fin juillet: commande OK, rack reçu

        second lot début août: commande OK, rack reçu

         

        Stock actuel au 19.09.2022:

        • 10 bouteilles pleines (individuelles)
        • Lot de 12 bouteilles supplémentaires (connectées ensemble) reçues la semaine dernière pour le banc de test 'Full scan'

         

        • Stock FEC Cards: from Lpnhe on the way, will be delivered at CERN at 182
        • Stock FEM Cards: #10

        - Camera 360: en cours d'installation (test de connexion au réseau cern à poursuivre): Fonctionne localement via un téléphone mobile, quelques difficultée pour le faire reconnaitre sur le réseau cern