ERAM Meeting
-
-
11:00
→
11:45
ERAM status
-
11:00
ERAM production status at Rui's lab 5mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN)
- 11:05
- 11:15
-
11:20
ERAM testing 10mSpeakers: Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
----------------------------------
After a trip during the high stats run this morning, the gain scans were started early.Gain scans with ERAM_13 were completed at 340V, 350V, 360V. Then, the setup was shut down and the gas flow was stopped.Data from gain scans can be found in:
https://cernbox.cern.ch/files/spaces/eos/project/t/t2k-eram/ERAM_PROD/ERAM-13/20221118_eram13_gain_340v
https://cernbox.cern.ch/files/spaces/eos/project/t/t2k-eram/ERAM_PROD/ERAM-13/20221118_eram13_gain_350v
https://cernbox.cern.ch/files/spaces/eos/project/t/t2k-eram/ERAM_PROD/ERAM-13/20221118_eram13_gain_360v
--------Metadata------------------
Author: Katharina Lachner
Status: open
System Affected: Gas,Micromegas
Message type: TPC
TPC_Entry_Type: Operation
---------------------------------- -
11:30
ERAM AOB 15mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR))
Stock of Stiffners/ FEC Cards / FEM Cards @ cern : => Stock-Stiffners-Available - Files - CERNBox: the CERN Cloud Storage
Stiffner Statusi: #15 Stiffners (+2 not sanded)
CAISSE Stiffner # Comments A 18 cleaned @Ruis'Lab 27 cleaned @Ruis'Lab 6 cleaned @Ruis'Lab 3 cleaned @Ruis'Lab 17 cleaned @Ruis'Lab B 42 cleaned @Ruis'Lab 41 cleaned @Ruis'Lab 44 cleaned @Ruis'Lab 43 cleaned @Ruis'Lab 46 cleaned @Ruis'Lab 45 cleaned @Ruis'Lab 47 cleaned @Ruis'Lab 48 cleaned @Ruis'Lab 5 not sanded yet 25 not sanded yet TOTAL STIFFNERS @CERN 15 (2 not sanded yet) FEC Cards Status (#7 pairs of FEC cards)
FEC #LEFT #RIGHT Location Comments 58 51 box 1/2 79 67 box 1/2 84 80 box 1/2 (fund into blue cabinet) 2 9 box 2/2 8 31 box 2/2 10 7 box 2/2 30 4 box 2/2 TOTAL STIFFNERS @CERN 7 Pair(s) of new FEC Cards ready to be used: FEM Cards Status: #7 cards
FEM # Comments FEM S01 en stock armoire bleue 182 1,00 FEM S18 en stock armoire bleue 182 1,00 FEM P04 en stock armoire bleue 182 1,00 FEM S03 en stock armoire bleue 182 1,00 FEM S34 en stock armoire bleue 182 1,00 FEM S32 en stock armoire bleue 182 1,00 FEM S37 en stock armoire bleue 182 FEM S007 en stock armoire bleue 182 1,00 FEM S13 en stock armoire bleue 182 FEM S28 en stock armoire bleue 182 Stock Carte FEM = 7,00 Rack de 6 bouteilles livré le 15.07.2022 - (il reste une bouteille pleine pour les tests XRay)
premier lot de 6 fin juillet: commande OK, rack reçu
second lot début août: commande OK, rack reçu
Stock actuel au 19.09.2022:
- 10 bouteilles pleines (individuelles)
- Lot de 12 bouteilles supplémentaires (connectées ensemble) reçues la semaine dernière pour le banc de test 'Full scan'
- Stock FEC Cards: from Lpnhe on the way, will be delivered at CERN at 182
- Stock FEM Cards: #10
- Camera 360: en cours d'installation (test de connexion au réseau cern à poursuivre): Fonctionne localement via un téléphone mobile, quelques difficultée pour le faire reconnaitre sur le réseau cern
-
11:00
-
11:00
→
11:45